Process Flow Diagram: Difference between revisions
Jump to navigation
Jump to search
Matt Parnell (talk | contribs) No edit summary |
Matt Parnell (talk | contribs) No edit summary |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
The process flow diagram, as updated in January 2022, is shown below. These drawings are the product of a reverse-engineering effort kicked off in the Fall of 2020 to better understand the pool systems as presently implemented. | |||
Items marked in red are part of the [[Pool Systems Automation|Automation]] system. | |||
Items marked in magenta are non-functional and/or are under review for future modification. | |||
<div class="responsive-image">[[File:FFSC-001 Pg 1 - Process Flow 1 of 2.png]]</div> | <div class="responsive-image">[[File:FFSC-001 Pg 1 - Process Flow 1 of 2.png]]</div> | ||
<div class="responsive-image">[[File:FFSC-001 Pg 2 - Process Flow 2 of 2.png]]</div> | <div class="responsive-image">[[File:FFSC-001 Pg 2 - Process Flow 2 of 2.png]]</div> | ||
Latest revision as of 11:58, 15 January 2022
The process flow diagram, as updated in January 2022, is shown below. These drawings are the product of a reverse-engineering effort kicked off in the Fall of 2020 to better understand the pool systems as presently implemented.
Items marked in red are part of the Automation system.
Items marked in magenta are non-functional and/or are under review for future modification.

