Process Flow Diagram: Difference between revisions
Jump to navigation
Jump to search
Matt Parnell (talk | contribs) No edit summary |
Matt Parnell (talk | contribs) No edit summary |
||
| Line 1: | Line 1: | ||
The process flow diagram, | The process flow diagram, as updated in June 2021, is shown below. These drawings are the product of a reverse-engineering effort kicked off in the Fall of 2020 to better understand the pool systems as presently implemented. | ||
Items marked in red are part of the [[Pool Systems Automation|Automation]] system. | Items marked in red are part of the [[Pool Systems Automation|Automation]] system. | ||
Revision as of 11:44, 11 September 2021
The process flow diagram, as updated in June 2021, is shown below. These drawings are the product of a reverse-engineering effort kicked off in the Fall of 2020 to better understand the pool systems as presently implemented.
Items marked in red are part of the Automation system.

