== Patching ==
== Patching ==


Patching of holes may periodically be needed, especially as the marcite finish ages.  Assume $300-500 per hole patched, though this number is very much subject to change.
Patching of holes may periodically be needed, especially as the marcite finish ages.  Assume $300-500 per hole patched, though this number is very much subject to change. The contractor requires the water temperature to be above 75 degrees (presumably for the sake of the divers).  This, of course, is mostly relevant for work in the early season before the boiler is operating. After a patch, allow at least 24 hours to cure before opening the area to swimmers.
 
The contractor requires the water temperature to be above 75 degrees (presumably for the sake of the divers).  This, of course, is mostly relevant for work in the early season before the boiler is operating.
 
After a patch, allow at least 24 hours to cure before opening the area to swimmers.


== Replacement ==
== Replacement ==