Process Flow Diagram

From Fairway Farms Swim Club
Revision as of 11:58, 15 January 2022 by Matt Parnell (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

The process flow diagram, as updated in January 2022, is shown below. These drawings are the product of a reverse-engineering effort kicked off in the Fall of 2020 to better understand the pool systems as presently implemented.

Items marked in red are part of the Automation system.

Items marked in magenta are non-functional and/or are under review for future modification.