Pool Boiler: Difference between revisions

Jump to navigation Jump to search
Line 137: Line 137:


* The Johnson Controls C450CCN-3 was moved to an external location for enhanced monitoring by a human operator.
* The Johnson Controls C450CCN-3 was moved to an external location for enhanced monitoring by a human operator.
* Relay coil taps were added to add monitoring of operating conditions by an external PLC.
* Relay coil taps were added to add monitoring of operating conditions by an external PLC.  These connections are documented in the pool systems automation [[:File:FFSC-001_Pg_40_-_Boiler_Auxiliary.png|Boiler Auxiliary]] drawing.
* Re-routing of some electrical in new liquid-tight conduit.
* Re-routing of some electrical in new liquid-tight conduit.

Navigation menu