Pool Boiler: Difference between revisions
Jump to navigation
Jump to search
no edit summary
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) No edit summary |
||
| Line 10: | Line 10: | ||
The low-water cut-out disconnects power from the 75 VA control transformer in the boiler. This prevents boiler operation when a low water situation is encountered. | The low-water cut-out disconnects power from the 75 VA control transformer in the boiler. This prevents boiler operation when a low water situation is encountered. | ||
=== Stage A: Demand for Heat === | === Stage A: Demand for Heat === | ||
| Line 115: | Line 113: | ||
Two copies of the CSD-1 should be kept by FFSC. One placed in a room near the boiler, another in a central filing location. | Two copies of the CSD-1 should be kept by FFSC. One placed in a room near the boiler, another in a central filing location. | ||
== Adjustments == | |||
=== Recirculation === | |||
== Troubleshooting == | == Troubleshooting == | ||