Pool Systems Introduction: Difference between revisions
Jump to navigation
Jump to search
→Boiler
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) (→Boiler) |
||
| Line 46: | Line 46: | ||
Regular inspections are mandated by the state and the insurance company. These inspections occur every three years. Prior to the official inspection, a '''Steam/Hot Water ASME CSD-1''' form must be completed by a qualified technician. This form contains details about the boiler (identified by the state license and serial numbers), identifying key controls, their set-points and operation test results. Any issues found during the technician's inspection must be remedied before the document becomes acceptable as proof of compliance per Rule 27 of the State of Michigan Boiler Code. | Regular inspections are mandated by the state and the insurance company. These inspections occur every three years. Prior to the official inspection, a '''Steam/Hot Water ASME CSD-1''' form must be completed by a qualified technician. This form contains details about the boiler (identified by the state license and serial numbers), identifying key controls, their set-points and operation test results. Any issues found during the technician's inspection must be remedied before the document becomes acceptable as proof of compliance per Rule 27 of the State of Michigan Boiler Code. | ||
Two copies of the CSD-1 should be kept by FFSC. One placed in a room near the boiler, another in a central filing location. | |||
===Troubleshooting=== | ===Troubleshooting=== | ||