The Asset Registry is maintained by Building & Grounds and reviewed by the board as a whole.  The original version was created by Sally Duffy and the 2020 Capital Assessment Committee.
The Asset Registry is maintained by Building & Grounds and reviewed by the board.  The original version was created by Sally Duffy and the 2020 Capital Assessment Committee.


<b>Last Updated:</b> January 26th, 2023
Where possible, inflation is considered (using [https://smartasset.com/investing/inflation-calculator this calculator], for instance).  Future investment is a "best guess" based upon past quotes or work, where possible.  NOTE: A higher-than-expected inflation rate took effect in 2022.  This has not necessarily been factored into calculations (August 2022).  Many estimates were made in 2020 and 2021.
 
Where possible, inflation is considered (using [https://smartasset.com/investing/inflation-calculator this calculator], for instance).  Future investment is a "best guess" based upon past quotes or work, where possible.  NOTE: A higher-than-expected inflation rate took effect in 2022.  This has not necessarily been factored into calculations at this time (August 2022).  Many estimates were made in 2020 and 2021.


Columns for <b>Failure Mode and Effect Analysis (FMEA)</b> were added in January 2023.  The columns are as follows:
Columns for <b>Failure Mode and Effect Analysis (FMEA)</b> were added in January 2023.  The columns are as follows:
Line 18: Line 16:
== Basement ==
== Basement ==


{| class="wikitable"
{{Note|type=info|text=This section was partially updated on January 4th, 2025.}}
 
{| class="wikitable sortable mw-collapsible"
!rowspan="2"|Item
!rowspan="2"|Item
!colspan="4"|Life Cycle (Years)
!colspan="4"|Life Cycle (Years)
Line 28: Line 28:
!Last<br>Rehab<br>Year
!Last<br>Rehab<br>Year
!Typical<br>Useful
!Typical<br>Useful
!Estimated<br>Remaining<br>(2021)
!Estimated<br>Remaining<br>(2025)
!1-5<br>Years
!1-5<br>Years
!5-10<br>Years
!5-10<br>Years
Line 37: Line 37:
!D
!D
!RPN
!RPN
|-
|Aquastat
|2024
|None
|20
|19
|
|
|
|$500
|3
|2
|3
|18
|A Honeywell T775A2009 aquastat (electronic temperature control) was installed on the hot water circulator pump to prevent thermal run-away and support immediate hot water at the sinks and showers.
|-
|-
|Breaker Panel ([[Electrical System#Basement Panel RLP-2|RLP-2]])
|Breaker Panel ([[Electrical System#Basement Panel RLP-2|RLP-2]])
Line 57: Line 72:
|None
|None
|10
|10
|style="background:#C6EFCE|8
|style="background:#C6EFCE|6
|
|
|
|
|$420
|$420
|
|
|1
|3
|5
|5
|5
|5
|25
|75
|The hot water circulator pump is a Grundfos Alpha2 15-55SFC (99163937) stainless steel circulation pump (1/16 HP).  The replacement cost is $330 in 2021 (maybe cheaper on surplus).  Circulation pumps are cited to last ten years - but as always, subject to environment and use.  Note that the circulation function has never really worked correctly (2021/2022) - further investigation may occur in 2023 (or later).
|The hot water circulator pump is a Grundfos Alpha2 15-55SFC (99163937) stainless steel circulation pump (1/16 HP).  The replacement cost is $330 in 2021 (maybe cheaper on surplus).  Circulation pumps are cited to last ten years - but as always, subject to environment and use.  As of 2021, it was noted that the circulation function didn't really work correctly.  In 2024, an aquastat was added to (finally) address the issues.
|-
|-
|Dehumidifier
|Dehumidifier "A"
|2020
|2020
|None
|None
|5
|5
|style="background:#FFEB9C|2
|style="background:#FFC7CE|0
|$330
|$330
|$380
|$380
Line 82: Line 97:
|192
|192
|The existing model is a Toshiba TDDP5012ES2 50pint/day unit (DOM: 08/2019, but not placed into service until 2020).  The replacement cost is $300.  Dehumidifiers tend to be short-lived (especially in high humidity, high-duty cycle environments).  It is estimated that this unit may only last five years.
|The existing model is a Toshiba TDDP5012ES2 50pint/day unit (DOM: 08/2019, but not placed into service until 2020).  The replacement cost is $300.  Dehumidifiers tend to be short-lived (especially in high humidity, high-duty cycle environments).  It is estimated that this unit may only last five years.
<B>FMEA Note:</b> While the severity of a failure is high (mold growth, if not resolved), this unit is easily replaceable and poses no risk to the operating status of the club.
|-
|-
|Dehumidifier
|Dehumidifier "B"
|2021
|2021
|None
|None
|5
|5
|style="background:#FFEB9C|3
|style="background:#FFC7CE|1
|$340
|$340
|$380
|$380
Line 96: Line 113:
|3
|3
|192
|192
|The existing model is a Frigidaire (Electrolux) FGAC7044U101 (DOM: 01/2019, but not placed into service until 2021).  The replacement cost is $300.  Dehumidifiers tend to be short-lived (especially in high humidity, high-duty cycle environments).  It is estimated that this unit may only last five years.  
|The existing model is a Frigidaire (Electrolux) FGAC7044U101 (DOM: 01/2019, but not placed into service until 2021).  The replacement cost is $300.  See the comments for <b>Dehumidifier "A"</b>.
|-
|-
|Fire Extinguisher
|Fire Extinguisher
Line 126: Line 143:
|5
|5
|175
|175
|Installed a new internal weeping tile system and sump pump in 2021.  Assume that after 20 years, the system may need to be replaced (again).  Painted basement walls with Liquid Rubber and Drylok in 2021.  Hydrostatic pressure is causing a bulge on the east wall (near the staircase).  TBD cost to address in the 5-10 year window (as of 2021) unless movement/cracking makes the project more urgent.
|Installed a new internal weeping tile system and sump pump in 2021.  Assume that after 20 years, the system may need to be replaced (again) due to the eventual infiltration of sediment.  Painted basement walls with Liquid Rubber and Drylok in 2021.  Hydrostatic pressure is causing a bulge on the east wall (near the staircase).  TBD cost to address in the 5-10 year window (as of 2021) unless movement/cracking makes the project more urgent.  As of 2022, some breakdown is visible in the corners (discoloration, visible water).  This may be corrected on a spot basis.
|-
|-
|Freezer (Chest)
|Freezer (Chest)
Line 158: Line 175:
|The existing model is an Electrolux KCCF160QWA commercial freezer (15.58 cu ft capacity).  This model does not appear to be made anymore; replacement with a KCCF170WH or equivalent (replacement cost in 2021 is about $930; about $1,300 in 2036 with inflation.
|The existing model is an Electrolux KCCF160QWA commercial freezer (15.58 cu ft capacity).  This model does not appear to be made anymore; replacement with a KCCF170WH or equivalent (replacement cost in 2021 is about $930; about $1,300 in 2036 with inflation.
|-
|-
|Freezer (Ice Cream)
|Freezer (Upright)
|2010
|2013
|None
|None
|20
|20
|style="background:#FFC7CE|Failed
|style="background:#C6EFCE|11
|
|
|
|
|TBD
|TBD
|
|
|
|8
|
|
|
|<b>2023 Update:</b> This unit has been identified to have failed in the prior year and is subject to replacement.</b>  The "Blue Bunny Ice Cream" freezer is a model RIO S125, built in 2010.  The replacement cost is estimated to be $900 (an Avantco DFC16-HCL in 2021 dollars, adjusted for inflation in 2030).  Past experience during a power outage suggests that these units are not particularly well insulated.  A better replacement may be desired when the 20-year estimated lifespan (2030) arrives.
|-
|Freezer (Upright)
|2013
|None
|20
|style="background:#C6EFCE|11
|
|
|TBD
|
|8
|2
|2
|2
|2
Line 202: Line 204:
|100
|100
|The distribution panel was informally inspected in 2021.  No signs of issues.  No plans for service or replacement soon.
|The distribution panel was informally inspected in 2021.  No signs of issues.  No plans for service or replacement soon.
<B>FMEA Note:</b> Regular inspections are required.
|-
|-
|Network Equipment
|Network Equipment
|2020
|2024
|2022
|2024
|5
|5
|style="background:#FFEB9C|4
|style="background:#FFEB9C|4
Line 216: Line 220:
|2
|2
|30
|30
|Some equipment replacement is anticipated every 5 years due to product end-of-life (EOL), failures, or technology upgrades.  The cost is not known at this time.  A new PoE network switch was installed in the clubhouse in 2022.  NOTE: For the sake of security, specifics about the network are not posted on the Wiki.
|Some equipment replacement is anticipated every five years due to product end-of-life (EOL), failures, or technology upgrades.  The cost is not known at this time.  A new PoE network switch was installed in the clubhouse in 2022 and again in 2024.  NOTE: For the sake of security, specifics about the network are not posted on the Wiki.
|-
|-
|Sump Pump
|Sump Pump
Line 246: Line 250:
|2
|2
|50
|50
|The tempering valve is a Powers LFMM 433-13 (1-1/4" 110 GPM).  This part number (as written in the plumbing invoice) needs to be confirmed; the -13 suffix doesn't seem to align with a real part number.  Tempering valves are cited to last 5-8 years in general.  The impact of seasonal use is TBD.  As of 2021, the functionality of the tempering valve and its interaction with the hot water circulation pump has been problematic.  Additional effort may be required in 2022.  The temperature/pressure gauge failed in 2021 and was replaced with a Watts WLFDPTG330200D.  The material and labor cost in 2020 was about $5,300; replacement in 2028 adjusted for inflation.
|The tempering valve is a Powers LFMM 433-13 (1-1/4" 110 GPM).  This part number (as written in the plumbing invoice) needs to be confirmed; the -13 suffix doesn't seem to align with an actual part number.  Tempering valves are cited to last 5-8 years in general.  The impact of seasonal use is TBD.  As of 2021, the functionality of the tempering valve and its interaction with the hot water circulation pump has been problematic.  An additional effort may be required in 2022.  The temperature/pressure gauge failed in 2021 and was replaced with a Watts WLFDPTG330200D.  The material and labor cost in 2020 was about $5,300; replacement in 2028 adjusted for inflation.
|-
|-
|UPS Batteries (Network)
|UPS Batteries (Network)
Line 261: Line 265:
|3
|3
|54
|54
|The network battery backup is an APC Smart-UPS SMC1500-2U.  It uses four [https://www.power-sonic.com/product/ps-1270/ PS-1270] lead-acid batteries (the replacement cost for the Power Sonic brand is $13 each from a local distributor).
|The network battery backup is an APC Smart-UPS SMC1500-2U.  It uses four [https://www.power-sonic.com/product/ps-1270/ PS-1270] lead-acid batteries (the replacement cost for the Power-Sonic brand is $13 each from a local distributor).
|-
|-
|Water Heater
|Water Heater
Line 268: Line 272:
|10
|10
|style="background:#FFC7CE|None
|style="background:#FFC7CE|None
|$20,000
|
|
|$9,000
|$27,000
|
|
|
|8
|8
Line 276: Line 280:
|8
|8
|style="background:#FFC7CE|512
|style="background:#FFC7CE|512
|The water heater is confirmed to have been installed in 2007, both by the serial number and the permit pulled noted in [[Club History#2007|club history]].  The existing unit is a Lochinvar TNR200-100 (100-gallon) fully condensing water heater.  The standard "rule of thumb" is to pre-emptively replace a water heater at the 10-year mark.  However, the fact that the water heater is drained and dormant from about September to April should have some longevity benefits.  Replacement is assumed to be necessary within the 5-10 year span (as of 2021), if not earlier.  The replacement cost is a rough estimate based on the cost for an equivalent unit in 2021. Due to supply chain issues, prices are abnormally high, and it is difficult to predict where pricing may be in 5+ years.
|The [domestic hot] water heater is confirmed to have been installed in 2007, both by the serial number and the permit pulled noted in [[Club History#2007|club history]].  The existing unit is a Lochinvar TNR200-100 (100-gallon) fully condensing water heater.  The standard "rule of thumb" is to pre-emptively replace a water heater at the 10-year mark.  However, the fact that the water heater is drained and dormant from about September to April should have some longevity benefits.  Replacement is assumed to be necessary within the 5-10 year span (as of 2021), if not earlier.  The replacement cost is based on a quote received for labor and materials in early 2023.
 
<b>FMEA Note:</b> It is assumed that the domestic hot water heater is critical to club operation (for health code reasons), and the club cannot operate without it.  Detecting a failure is difficult (water heaters often fail with little to no warning once they cross the decade-old mark).  Failure is more or less "inevitable" for a residential-grade unit.  It's not clear how the commercial-grade unit differs.
|-
|-
|}
|}
Notes:
* The Freezer (Ice Cream) - "Blue Bunny Ice Cream" freezer is a model RIO S125, built in 2010 - was removed from service in 2023 (or 2024?) after identifying it had failed.


== Basketball and Tennis Courts ==
== Basketball and Tennis Courts ==
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}}
{| class="wikitable"
{| class="wikitable"
!rowspan="2"|Item
!rowspan="2"|Item
!colspan="4"|Life Cycle (Years)
!colspan="4"|Life Cycle (Years)
!colspan="4"|Estimated Future<br>Investment
!colspan="4"|Estimated Future<br>Investment
!colspan="4"|FMEA
!rowspan="2"|Comment
!rowspan="2"|Comment
|-
|-
Line 290: Line 303:
!Last<br>Rehab<br>Year
!Last<br>Rehab<br>Year
!Typical<br>Useful
!Typical<br>Useful
!Estimated<br>Remaining<br>(2021)
!Estimated<br>Remaining<br>(2023)
!1-5<br>Years
!1-5<br>Years
!5-10<br>Years
!5-10<br>Years
!10-15<br>Years
!10-15<br>Years
!15-20<br>Years
!15-20<br>Years
!S
!O
!D
!RPN
|-
|-
|Basketball Poles
|Basketball Poles
Line 305: Line 322:
|
|
|
|
|5
|2
|2
|20
|Lifespan, replacement plans, and replacement cost are TBD.
|Lifespan, replacement plans, and replacement cost are TBD.
|-
|-
Line 314: Line 335:
|
|
|$38,000
|$38,000
|
|
|
|
|
|
|
|
Line 319: Line 344:
# Powerwash to clean.  Fill cracks with acrylic crack filler, then resurface and paint for about $20,000.  Based on just short of 900 ft of cracks at 2020 pricing.  This is a very short-term solution; assume cracks will re-appear after a large day/night temperature swing (and especially after a freeze/thaw).  For that reason, this repair is not recommended.
# Powerwash to clean.  Fill cracks with acrylic crack filler, then resurface and paint for about $20,000.  Based on just short of 900 ft of cracks at 2020 pricing.  This is a very short-term solution; assume cracks will re-appear after a large day/night temperature swing (and especially after a freeze/thaw).  For that reason, this repair is not recommended.
# The same as the prior option, plus fabric overlay crack repair (2-year guarantee) for about $33,000.  This solution should last 4-5 years (after which cracks may re-appear).  This may be the best solution for the near term.  For this option, the sport coating contractor may be hired directly.
# The same as the prior option, plus fabric overlay crack repair (2-year guarantee) for about $33,000.  This solution should last 4-5 years (after which cracks may re-appear).  This may be the best solution for the near term.  For this option, the sport coating contractor may be hired directly.
# Grind down 2 inches of the surface, then re-build for about $100,000 ($50,000 per court).  For this option, hire a paving contractor; the sport coating is sub-contracted.
# Grind down 2 inches of the surface, then re-build for about $100,000 ($50,000 per court).  For this option, hire a paving contractor; the sport coating is subcontracted.
# Demolish entirely, add improved drainage, then re-build for about $150,000 ($75,000 per court).  This is by far the most expensive, but the most effective solution depending upon the underlying issues (i.e. very wet grounds).  For this option, hire a paving contractor; the sport coating is sub-contracted.
# Demolish, add improved drainage, then rebuild for about $150,000 ($75,000 per court).  This is by far the most expensive, but the most effective solution depending upon the underlying issues (i.e. very wet grounds).  For this option, hire a paving contractor; the sport coating is subcontracted.
Given present budgets, it seems likely that option #2 is the best choice for the 5-10 year window.  The lifespan of 5 years assumes repeated use of option #2.
Given current budgets, it seems likely that option #2 is the best choice for the 5-10 year window.  The lifespan of 5 years assumes repeated use of option #2.
|-
|-
|Surface (Tennis)
|Surface (Tennis)
Line 330: Line 355:
|
|
|$42,000
|$42,000
|
|
|
|
|
|
|
|
Line 345: Line 374:
|style="background:#C6EFCE|9
|style="background:#C6EFCE|9
|$400
|$400
|
|
|
|
|
|
|
|
Line 356: Line 389:
|TBD
|TBD
|$150
|$150
|
|
|
|
|
|
|
|
Line 364: Line 401:


== Clubhouse ==
== Clubhouse ==
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"
Line 374: Line 413:
!Last<br>Rehab<br>Year
!Last<br>Rehab<br>Year
!Typical<br>Useful
!Typical<br>Useful
!Estimated<br>Remaining<br>(2021)
!Estimated<br>Remaining<br>(2023)
!1-5<br>Years
!1-5<br>Years
!5-10<br>Years
!5-10<br>Years
Line 394: Line 433:
|Breaker Panel ([[Electrical System#Basement Panel RLP-1|RLP-1]])
|Breaker Panel ([[Electrical System#Basement Panel RLP-1|RLP-1]])
|2007
|2007
|2020
|2022
|TBD
|TBD
|TBD
|TBD
Line 401: Line 440:
|
|
|
|
|The "upstairs" panel was added in [[Club History#2007|2007]] presumably to support additional circuits (hand dryers, etc).  No plans to replace in the 20-year window.
|The "upstairs" panel was added in [[Club History#2007|2007]] presumably to support additional circuits (hand dryers, etc).  There are no plans to replace it in the 20-year window.  The panel was last serviced in 2022.  Lug torques were verified, and new circuits were added.
 
<b>FMEA Note:</b> Regular inspections are required to meet the "detection" value.
|-
|-
|Changing Table
|Changing Table
Line 407: Line 448:
|None
|None
|20
|20
|style="background:#C6EFCE|18
|style="background:#C6EFCE|17
|
|
|
|
|
|
|
|
|The baby changing station is a Koala Kare KB200 (replacement cost is $210 based on average online pricing as of 2021).  The lifespan is a guess and may be adjusted depending on observations of wear and tear in future years.  There is no planned replacement within the 20-year window (as of 2021).
|The baby changing station is a Koala Kare KB200 (replacement cost is $210 based on average online pricing as of 2021).  The lifespan is a guess and may be adjusted depending on observations of wear and tear in future years.  There is no planned replacement within the 20-year window (as of 2023).
|-
|-
|Chimney
|Chimney
Line 419: Line 460:
|TBD
|TBD
|style="background:#FFC7CE|None
|style="background:#FFC7CE|None
|TBD
|
|
|
|
|
|
|
|The chimney is most likely original to the 1966 structure.  It is functionally obsolete; the only device producing combustion gases in the clubhouse is vented via PVC pipe.  Unfortunately, the mortar appears to be failing.  Tuckpointing is recommended shortly.  Alternatively, the chimney could potentially be removed.
|The chimney is most likely original to the 1966 structure.  It is functionally obsolete; the only device producing combustion gases in the clubhouse is vented via PVC pipe.  Unfortunately, the mortar appears to be failing.  Tuckpointing is recommended in the near future.  Alternatively, the chimney could potentially be removed.
|-
|-
|Computer
|Computer
Line 429: Line 470:
|None
|None
|5
|5
|style="background:#FFEB9C|4
|style="background:#FFEB9C|3
|
|
|
|
Line 445: Line 486:
|
|
|
|
|The family restroom ceiling was replaced in 2020 upon discovery that it was sagging several inches in the middle of the room.
|The family restroom ceiling was replaced in 2020 upon discovery that it was sagging several inches in the middle of the room.  No replacement is planned.
|-
|-
|Drywall (Lobby Ceiling)
|Drywall (Lobby Ceiling)
Line 456: Line 497:
|
|
|
|
|Repairs were made to the drywall near the north end (to address sagging) during the 2022 lobby renovation.  At this time, it was observed that repairs had previously been made near the "Fairway Farms" glass by the stairs.   
|Repairs were made to the drywall near the north end (to address sagging) during the 2022 lobby renovation.  At this time, it was observed that repairs had previously been made near the "Fairway Farms" glass by the stairs.  No replacement is planned.
|-
|-
|Electrical
|Electrical
Line 462: Line 503:
|2020
|2020
|10
|10
|style="background:#C6EFCE|9
|style="background:#C6EFCE|7
|
|
|TBD
|TBD
|
|
|TBD
|TBD
|<p>Much of the wiring in the clubhouse is original to the 1966 installation.  Fortunately, #12 AWG copper was run in rigid conduit throughout.</p><p>In 2020, the wiring was inspected and found to be in good condition.  Nearly all receptacles, switches, and fixtures were replaced.  All associated connections (screws, wire nuts) were removed, cleaned of oxidation, and re-terminated.  Wiring in panels ([[Electrical System#Basement Panel RLP-1|RLP-1]] and [[Electrical System#Basement Panel RLP-2|RLP-2]]) was cleaned up, and all branch-side lugs were torqued to spec.</p><p>The basement switchgear was inspected and deemed to be in good operating condition (no replacement planned).</p><p>Replacement of certain receptacles, switches and fixtures may be needed on a 10-year interval.  The cost is TBD.</p>
|<p>Much of the wiring in the clubhouse is original to the 1966 installation.  Fortunately, #12 AWG copper was run in rigid conduit throughout.</p><p>In 2020, the wiring was inspected and found in good condition.  Nearly all receptacles, switches, and fixtures were replaced.  All associated connections (screws, wire nuts) were removed, cleaned of oxidation, and re-terminated.  Wiring in panels ([[Electrical System#Basement Panel RLP-1|RLP-1]] and [[Electrical System#Basement Panel RLP-2|RLP-2]]) was cleaned up, and all branch-side lugs were torqued to spec.</p><p>The basement switchgear was inspected and deemed to be in good operating condition (no replacement planned).</p><p>Replacement of certain receptacles, switches, and fixtures may be needed on a 10-year interval.  The cost is TBD.</p>
|-
|-
|Exit Signs
|Exit Signs
Line 473: Line 514:
|None
|None
|5
|5
|style="background:#FFEB9C|3
|style="background:#FFEB9C|2
|$80
|$80
|$90
|$90
|$100
|$100
|$120
|$120
|The lifespan of the exit signs (2) is largely determined by the ability of the internal rechargeable batteries to sustain 90 minutes of illumination upon power failure.  This is an annual city inspection requirement.  The battery pack may be replaceable.  If not, off-brand exist signs with floodlights can be had for as little as $40 (or less) on Amazon.
|The lifespan of the two exit signs is largely determined by the ability of the internal rechargeable batteries to sustain 90 minutes of illumination upon power failure.  This is an annual city inspection requirement (Livonia Code of Ordinances 15.32.030).  The battery pack may be replaceable.  If not, off-brand exit signs with floodlights can be had for as little as $40 (or less) on Amazon.
|-
|-
|Fans (Pedestal)
|Fans (Pedestal)
Line 484: Line 525:
|None
|None
|50
|50
|style="background:#C6EFCE|23
|style="background:#C6EFCE|22
|
|
|
|
|
|
|
|
|There are two pedestal fans (2) in the clubhouse.  One appears to be from 1995, the date of manufacture for the other is not known (TBD).  The fans are anticipated to last beyond the 20 year view (as of 2021). Small repairs may be needed, cost TBD.
|There are two pedestal fans in the clubhouse.  One appears to be from 1995; the date of manufacture for the other is unknown (TBD).  The fans are anticipated to last beyond the 20-year view (as of 2021). Minor repairs may be needed; the cost is TBD.
|-
|-
|Fire Extinguisher
|Fire Extinguisher
Line 495: Line 536:
|2020
|2020
|12
|12
|style="background:#C6EFCE|6
|style="background:#C6EFCE|5
|$70
|$70
|$140
|$140
|$80
|$80
|$180
|$180
|The clubhouse (lobby) fire extinguisher is an Advantage ADV-10, as of 2021, last serviced in May 2020 (per punch tag).  Six-year maintenance ($38 in 2021 dollars) is assumed due in 2022 and 2034. Replacement ($90 in 2021 dollars) is due in 2028 and 2040. Annual servicing ($6 in 2021 dollars) is required. Prices are adjusted for inflation.  
|The clubhouse (lobby) fire extinguisher is an Advantage ADV-10, as of 2021, last serviced in May 2020 (per punch tag).  Six-year maintenance ($38 in 2021 dollars) is assumed to be due in 2022 and 2034. Replacement ($90 in 2021 dollars) is due in 2028 and 2040. Annual servicing ($6 in 2021 dollars) is required. Prices are adjusted for inflation.  
|-
|-
|Floor
|Floor
Line 511: Line 552:
|
|
|
|
|Any rehabilitation or replacement of the floor in the clubhouse (main floor) is yet to be discussed.  Installation date not known.
|Any rehabilitation or replacement of the floor in the clubhouse (main floor) is yet to be discussed.  The original installation date is not known.
|-
|-
|Gutters
|Gutters
Line 522: Line 563:
|
|
|
|
|Gutters are in disrepair (leaking) and should be replaced.  The plan is for the 5-10 year window (as of 2021).  Had quotes in 2020 - need to locate for reference.
|Gutters are in disrepair (leaking) and should be replaced.  The plan is for the 5-10 year window (as of 2021).  We received quotes in 2020 that need to be located for reference.
|-
|-
|Hand Dryers
|Hand Dryers
Line 528: Line 569:
|None
|None
|25
|25
|style="background:#C6EFCE|12
|style="background:#C6EFCE|9
|
|
|
|
|$400
|$400
|
|
|The existing American Dryer (Global Dryer) model GX1 units were installed in [[Club_History#2007|2007]].  Lifespan is a guess.  The cost is for two replacement units in 2032 ($150/ea in 2021 prices).  Labor is not included.
|The existing American Dryer (Global Dryer) model GX1 units were installed in [[Club_History#2007|2007]].  Lifespan is a guess.  The estimated cost is for two replacement units in 2032 ($150/ea in 2021 prices).  Labor is not included.
|-
|-
|Lights (Vapor-Proof)
|Lights (Vapor-Proof)
Line 539: Line 580:
|None
|None
|16
|16
|style="background:#C6EFCE|14
|style="background:#C6EFCE|13
|
|
|
|
|TBD
|TBD
|
|
|The fixtures are TOGGLED FV420PO-A423-40230 (includes 2 x 4000K 23 W 3,100 lumen bulbs).  The replacement cost in 2021 is about $65 per fixture.  TOGGLED rates the bulbs for 16 years (subject to vary based on exposure and usage).  No replacement cost is given for 2036 as technology may dictate a very different solution at that point.
|The fixtures are TOGGLED FV420PO-A423-40230 (includes 2 x 4000K 23 W 3,100 lumen bulbs).  The replacement cost in 2021 is about $65 per fixture.  TOGGLED rates the bulbs for 16 years (subject to vary based on exposure and usage).  No replacement cost is given for 2036, as technology may dictate a different solution.
|-
|-
|PA Amplifier
|PA Amplifier
Line 550: Line 591:
|None
|None
|20
|20
|style="background:#C6EFCE|18
|style="background:#C6EFCE|17
|
|
|
|
|
|
|$1,300
|$1,300
|The amplifier's lifespan is based upon many factors; 20 years is an educated guess.  The biggest enemies to its longevity are excessive heat, dirt infiltration, and condensation.  Keeping the amplifier cool and clean is critical.  Often amplifiers fail due to their power supply capacitors failing; these may or may not be replaceable (the unit may be serviceable).  The cost is an estimate based upon the retail cost of the existing JBL CSMA 2120, plus inflation, in 2040.
|The amplifier's lifespan is based upon many factors; 20 years is an educated guess.  The biggest enemies to its longevity are excessive heat, dirt infiltration, and condensation.  Keeping the amplifier cool and clean is critical.  Often amplifiers fail due to their power supply capacitors failing; these may or may not be replaceable (the unit may be serviceable).  The cost is an estimate based on the retail cost of the existing JBL CSMA 2120, plus inflation, in 2040.
|-
|-
|Radios
|Radios
Line 566: Line 607:
|$110
|$110
|$120
|$120
|There are six Motorola MH230R FRS/GMRS radios docked in the clubhouse, used for grounds-wide communication.  Four radios were purchased in 2021 to match the existing two units on hand.  New "old stock" KEBT-086-C batteries were installed in 2021.  Three charging stations are used to trickle-charge the NiMH battery packs.  Based on observations in 2021, these radios are used and abused quite hard; regular replacement is assumed.  Assume a replacement cost of $80 for 2 radios per 5-year interval, adjusted for inflation.
|There are six Motorola MH230R FRS/GMRS radios in the clubhouse, used for grounds-wide communication.  Four radios were purchased in 2021 to match the existing two units on hand.  New "old stock" KEBT-086-C batteries were installed in 2021.  Three charging stations are used to trickle-charge the NiMH battery packs.  Based on observations in 2021, these radios are used and abused quite hard; regular replacement is assumed.  Assume a replacement cost of $80 for two radios per 5-year interval, adjusted for inflation.
|-
|-
|<div id="0001">Roof</div>
|<div id="0001">Roof</div>
Line 572: Line 613:
|None
|None
|20
|20
|style="background:#C6EFCE|12
|style="background:#C6EFCE|11
|
|
|
|
Line 584: Line 625:
|30
|30
|style="background:#FFC7CE|None
|style="background:#FFC7CE|None
|$7,000
|$8,200
|
|
|$8,000
|$8,000
|
|
|Propose replacing 2 restroom exterior doors (failing) and 3 interior restroom doors (men's and women's) 1-5 years.  Propose replacing all others - 2 exterior doors and 2 interior doors in 10-15 years.
|The steel doors appear to be original to the building.  There are nine doors in total: two for the lobby exterior, two for the family restroom, three for the men's room, and two for the women's room.  It has been proposed to replace the two exterior restroom doors and the interior men's room door as soon as possible.  Then, replace the two doors between the men's and women's room and lobby in five years or less.  The other exterior and interior doors may need to be replaced in 10-15 years.  Costs are based on estimates received in 2023.
|-
|-
|Showers
|Showers
Line 610: Line 651:
|
|
|
|
|The wooden soffit is in disrepair and in need of replacement with a low-maintenance product.  The venting grate is failing and has allowed animal intrusion.  The replacement should coincide with gutter (and possible fascia) replacement.  No estimates have been made at this point.
|The wooden soffit is in disrepair and needs replacement with a low-maintenance product.  The venting grate is failing and has allowed animal intrusion.  The replacement should coincide with gutter (and possible fascia) replacement.  No estimates have been made at this point.
|-
|-
|Toilets
|Toilets
Line 627: Line 668:
|2021
|2021
|5
|5
|style="background:#FFEB9C|5
|style="background:#FFEB9C|3
|$1,100
|$1,100
|$1,300
|$1,300
Line 638: Line 679:
|None
|None
|5
|5
|style="background:#FFEB9C|3
|style="background:#FFEB9C|2
|$30
|$30
|$30
|$30
Line 663: Line 704:


== Grounds ==
== Grounds ==
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"
Line 673: Line 716:
!Last<br>Rehab<br>Year
!Last<br>Rehab<br>Year
!Typical<br>Useful
!Typical<br>Useful
!Estimated<br>Remaining<br>(2021)
!Estimated<br>Remaining<br>(2023)
!1-5<br>Years
!1-5<br>Years
!5-10<br>Years
!5-10<br>Years
Line 706: Line 749:
|2020
|2020
|5
|5
|style="background:#FFEB9C|3
|style="background:#FFEB9C|2
|$14,400
|$14,400
|$16,300
|$16,300
|$18,500
|$18,500
|$20,800
|$20,800
|The asphalt parking lot was first installed in 2000.  Maintenance is necessary every 5-7 years (largely subject to weather).  Maintenance was known to have been performed in [[Club History#2015|2015]] and 2020.  Costs for 2025, 2030, 2035, and 2040 are based on the prior estimate (for 2020) with inflation.
|The asphalt parking lot was first installed in 2000.  Maintenance is necessary every 5-7 years (largely subject to weather).  Maintenance was known to have been performed in [[Club History#2015|2015]] and 2020.  Costs for 2025, 2030, 2035, and 2040 are based on the prior estimate (for 2020) with inflation.  NOTE: There has been some discussion (Spring 2023) whether a complete re-surfacing may be required?  Cost might be as high as $100k?  To be discussed further.
|-
|-
|Picnic Tables (Plastic)
|Picnic Tables (Plastic)
Line 717: Line 760:
|None
|None
|20
|20
|style="background:#FFEB9C|5
|style="background:#FFEB9C|4
|TBD
|TBD
|TBD
|TBD
|TBD
|TBD
|TBD
|TBD
|A spot check of a few tables suggests that the entire lot may have been purchased (or at least manufactured) in 2007.  Some tables are starting to fail mechanically and have been temporarily repaired.  Some of the painted metal parts are flaking/rusting.  It likely makes the most sense to start purchasing a small number of tables to begin replacement of the worst units over time - unless there is a substantial benefit from a bulk order.  The lifespan of 20 years is based upon current wear and tear.  It seems possible that within 5 years (from 2022), the condition of some tables may be approaching "poor".  To be determined.
|A spot check of a few tables suggests that the entire lot may have been purchased (or at least manufactured) in 2007.  Some tables are starting to fail mechanically and have been temporarily repaired.  Some of the painted metal parts are flaking/rusting.  It likely makes the most sense to start purchasing a small number of tables to begin the replacement of the worst units over time - unless there is a substantial benefit from a bulk order.  The lifespan of 20 years is based on current wear and tear.  It seems possible that within 5 years (from 2022), the condition of some tables may be approaching "poor".  To be determined.
|-
|-
|Picnic Tables (Wooden)
|Picnic Tables (Wooden)
Line 733: Line 776:
|$130
|$130
|$150
|$150
|Outright replacement of the wooden picnic tables (7 on the property as of 2021) is not anticipated.  Instead, periodic wood/hardware replacement, along with stripping/painting should keep the tables in good working order.  Predicting maintenance cost is difficult, given the volatile cost of lumber.  Assume $100 every 5 years, adjusted for inflation.  All tables were power-washed and painted in 2021.
|Outright replacement of the wooden picnic tables (7 on the property as of 2021) is not anticipated.  Instead, periodic wood/hardware replacement and stripping/painting should keep the tables in good working order.  Predicting maintenance costs is difficult, given the volatile cost of lumber.  Assume $100 every 5 years, adjusted for inflation.  All tables were power-washed and painted in 2021.
|-
|-
|Play Structure
|Play Structure
Line 739: Line 782:
|None
|None
|20
|20
|style="background:#C6EFCE|14
|style="background:#C6EFCE|13
|
|
|TBD
|TBD
|
|
|TBD
|TBD
|The present Miracle Recreation play structure (and swing sets) were installed in 2016.  Miracle recommends playground updates every 8-10 years; playgrounds can last 10-20 or more years dependent upon weather and usage.  An estimated replacement date of 20 years is given, though the equipment may last longer.  Regular inspections must be performed.  Assume some maintenance cost within 5-10 years (from 2021).
|The present Miracle Recreation play structure (and swing sets) were installed in 2016.  Miracle recommends playground updates every 8-10 years; playgrounds can last 10-20 or more years, dependent upon weather and usage.  An estimated replacement date of 20 years is given, though the equipment may last longer.  Regular inspections must be performed.  Assume some maintenance cost within 5-10 years (from 2021).
|-
|-
|Privacy Fence
|Privacy Fence
Line 775: Line 818:
|None
|None
|40
|40
|style="background:#C6EFCE|39
|style="background:#C6EFCE|37
|
|
|
|
Line 786: Line 829:
|None
|None
|5
|5
|style="background:#FFEB9C|4
|style="background:#FFEB9C|2
|$380
|$380
|$420
|$420
|$480
|$480
|$540
|$540
|The present APs were installed in 2020 and are fully supported as of 2021.  An estimated life of 5 years is given, largely due to the likelihood that the product will go EOL by then.  2 of the 3 APs are mounted outdoors, and the 3rd exists in a non-climate controlled building (clubhouse).  The APs are powered year-round to help drive off potential internal condensation.  Still, exposure may reduce their lifespan.  If the product is still supported after the 5-year mark (2025), and the units are functional, an evaluation of the performance vs. a replacement should be considered.  The replacement cost in 2021 is $125/ea (3 units).  A replacement cycle of 5 years is assumed (units may remain in service longer).
|The present APs were installed in 2020 and are fully supported as of 2021.  An estimated life of 5 years is given, largely due to the likelihood that the product will go EOL by then.  2 of the 3 APs are mounted outdoors, and the 3rd exists in a non-climate-controlled building (clubhouse).  The APs are powered year-round to help drive off potential internal condensation.  Still, exposure may reduce their lifespan.  If the product is still supported after the 5-year mark (2025), and the units are functional, an evaluation of the performance vs. a replacement should be considered.  The replacement cost in 2021 is $125/ea (3 units).  A replacement cycle of 5 years is assumed (units may remain in service longer).
|-
|-
|Volleyball Net
|Volleyball Net
Line 797: Line 840:
|None
|None
|5
|5
|style="background:#FFEB9C|5
|style="background:#FFEB9C|3
|
|
|$220
|$220
Line 807: Line 850:


== Large Pavilion ==
== Large Pavilion ==
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"
Line 859: Line 904:


== Men's Restroom ==
== Men's Restroom ==
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"
Line 881: Line 928:
|}
|}


== Other ==
== Pool ==
 
{| class="wikitable"
!rowspan="2"|Item
!colspan="4"|Life Cycle (Years)
!colspan="4"|Estimated Future<br>Investment
!rowspan="2"|Comment
|-
!Install<br>Year
!Last<br>Rehab<br>Year
!Typical<br>Useful
!Estimated<br>Remaining<br>(2021)
!1-5<br>Years
!5-10<br>Years
!10-15<br>Years
!15-20<br>Years
|-
|Projector
|2017
|None
|10
|style="background:#C6EFCE|5
|
|TBD
|
|
|The existing projector is a Viewsonic PJD555W (DLP 1280x800 WXGA, 20,000:1 contrast, 3,300 lumens).  It is discontinued by the manufacturer (as of 2017).  Lamp hours as of 2021 not know (lifespan is 5,000 hours).  Replacement may be desired to purchase a higher-lumen model to allow utilization before dusk (low priority).  A lifespan of 10 years has been assigned; it's assumed that by 2027, a replacement will be desired.  Movie nights in 2022 were hosted using member-provided equipment.
|-
|Projector Screen
|TBD
|TBD
|TBD
|TBD
|
|
|
|
|This item is TBD.  Two "old" projector screens were removed and discarded in 2022.  A third (new-in-box) remains in the basement.  Movie nights in 2022 were hosted using member-provided equipment.
|-
|}


== Pool ==
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"
Line 1,153: Line 1,161:


== Pump House ==
== Pump House ==
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"
Line 1,405: Line 1,415:


== Snack Shack ==
== Snack Shack ==
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"
Line 1,533: Line 1,545:


== Women's Restroom ==
== Women's Restroom ==
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}}


{| class="wikitable"
{| class="wikitable"