Construction on the club began in 1966 with the intent to open for swimming. Unfortunately, this did not happen due to financial hardship and construction delays. The details below are extracted from the architect's monthly progress reports. It is difficult to know when exactly some items were completed; some may have actually been completed in the months prior. | Construction on the club began in 1966 with the intent to open for swimming. Unfortunately, this did not happen due to financial hardship and construction delays. The details below are extracted from the architect's monthly progress reports. It is difficult to know when exactly some items were completed; some may have actually been completed in the months prior. | ||
* The | * Land was purchased in April. | ||
* The original proposal to build a swimming pool and "bath house" was submitted by Starlite Pools, Inc. This plan would ultimately see multiple revisions over the next two years. | |||
* As of June, the site had been graded and sewer line installation started. Basement excavation was complete and the block walls were installed (along with waterproofing). | * As of June, the site had been graded and sewer line installation started. Basement excavation was complete and the block walls were installed (along with waterproofing). | ||
* As of July, water and sewer service were installed. Above-grade masonry, wall footings and wood joists were all set to installed same month. | * As of July, water and sewer service were installed. Above-grade masonry, wall footings and wood joists were all set to installed same month. | ||
| Line 47: | Line 48: | ||
=1997= | =1997= | ||
* Installed a galvanized steel and vinyl "FAIRWAY FARMS" awning. | * Installed a galvanized steel and vinyl "FAIRWAY FARMS" awning | ||
** Is this actually the awning present in 2020? If so, it is a Sunbrella fabric, purchased and installed by Marygrove awning. | |||
** The vinyl terminology came from city permit documentation and may not be correct. | |||
=1998= | =1998= | ||
| Line 63: | Line 66: | ||
=2007= | =2007= | ||
* Changed electrical service (added upstairs panel | * Changed electrical service (added upstairs panel per inspection sticker). | ||
* Installed 2 electric hand dryers. | * Installed 2 electric hand dryers. | ||
* Installed 5 BBQ gas grills (assumed). | * Installed 5 BBQ gas grills (assumed). | ||
| Line 79: | Line 82: | ||
=2011= | =2011= | ||
* City noted the water gate valve was leaking and would require repair. In the context of the 2020/2021 water gate valve issues, it is not clear what repairs were performed at this time. | * City noted the [[Water Gate Valve|water gate valve]] was leaking and would require repair. In the context of the 2020/2021 water gate valve issues, it is not clear what repairs were performed at this time. | ||
=2013= | =2013= | ||
* The locker rooms, | * The locker rooms, clubhouse and some exterior areas were painted. | ||
* The broken life guard stand near the kids pool was repaired. | * The broken life guard stand near the kids pool was repaired. | ||
* The pool sand filters were rebuilt with new sand and internal components. | * The pool sand filters were rebuilt with new sand and internal components. | ||