Club History: Difference between revisions
Jump to navigation
Jump to search
Matt Parnell (talk | contribs) (Created page with "==2015== * The parking lot was resealed in the fall (should be performed again in 5-7 years). ==2016== * First full winter of use with the new pool cover (better water qual...") |
Matt Parnell (talk | contribs) (→2017) |
||
| Line 13: | Line 13: | ||
* Several sections of the concrete pool deck were replaced. | * Several sections of the concrete pool deck were replaced. | ||
* A large wind storm | * A large [https://www.detroitnews.com/story/news/local/michigan/2017/03/08/90k-without-power-and-winds-sweep-metro-detroit/98899718/ wind storm] on March 8th caused significant damage: | ||
** A large section of shingles ripped off of the large pavilion. | ** A large section of shingles ripped off of the large pavilion. | ||
** The vinyl ceiling of the large pavilion was blown off along with several light fixtures. | ** The vinyl ceiling of the large pavilion was blown off along with several light fixtures. | ||
Revision as of 00:22, 10 March 2021
2015
- The parking lot was resealed in the fall (should be performed again in 5-7 years).
2016
- First full winter of use with the new pool cover (better water quality, less debris, no need to acid-clean the marcite and conserves water).
- Implementation of a recycling program.
- Locks re-keyed.
- New play scape and swing set installed.
2017
- Several sections of the concrete pool deck were replaced.
- A large wind storm on March 8th caused significant damage:
- A large section of shingles ripped off of the large pavilion.
- The vinyl ceiling of the large pavilion was blown off along with several light fixtures.
- The sump pump and heater in the pump house failed due to the power outage. This resulted in the main pool pump, slide pump and other mechanical/electrical components to be submerged and ultimately freeze.
- The recycling program was ended due to a lack of availability with the waste companies.
- The Locust trees (near the tennis courts) produced a tremendous number of large seed pods; this happens every so many years under the right conditions.
2018
- No major capital improvements.
- Hosted league meet.
- An extensive "deep cleaning" of the clubhouse floors, walls, ceilings and various rooms was performed.
- Painted various areas, including the women's restroom.
- Additional concrete deck replacement and leveling.
- The starting block anchors were replaced.
- The basketball poles were replaced.
- Tennis courts were marked for pickleball.
2019
- No major capital improvements.
- New cameras (Arlo) system installed.
- Minor painting touch-up around the grounds and clubhouse.
- It was noted that the water gate valve was leaking and repair would be needed.