Board Building and Grounds: Difference between revisions
→Post-Season Tasks
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) |
||
| Line 104: | Line 104: | ||
== Post-Season Tasks == | == Post-Season Tasks == | ||
=== Early September: Close the Pool === | |||
* Remove the ceiling fans from the large pavilion. As of 2020, duplicate mounts have been installed in the basement ceiling joists for safe storage. Removing the fans is very important; high winds during winter can cause the fans to rotate at high speeds, damaging fan blades and/or the vinyl ceiling of the pavilion. | |||
* Be on-site for pool closing and winterization with the contractor. | * Be on-site for pool closing and winterization with the contractor. | ||
** Ensure that all parts removed (particularly in the pump house) are properly stored/labeled. In the past, some parts have been lost, adding cost and delays to opening. | ** Ensure that all parts removed (particularly in the pump house) are properly stored/labeled. In the past, some parts have been lost, adding cost and delays to opening. | ||
** Identify any issues found and make plans to resolve by the next season's opening. | ** Identify any issues found and make plans to resolve by the next season's opening. | ||
* Remove and store the pH and ORP probes off-site per the manufacturer's recommendations (must be kept in solution and above freezing temperatures). | |||
* Turn the [[Water Gate Valve|water gate valve]] at the street and request water meter removal by the city. | |||
* Turn off all labeled seasonal circuits in the pump house breaker panel. Ensure that the sump pump and dusk-to-dawn lighting circuits remain on year-round. | * Turn off all labeled seasonal circuits in the pump house breaker panel. Ensure that the sump pump and dusk-to-dawn lighting circuits remain on year-round. | ||
* | * Cancel garbage pickup. | ||
=== Before November === | |||
We must perform the following tasks (in no particular order) after Labor Day but before the onset of freezing temperatures. | |||
* Contract a firm to handle snow removal from November through March. We must clear the sidewalks; the club will violate city ordinances [https://library.municode.com/mi/livonia/codes/code_of_ordinances?nodeId=CO_TIT12STSIPUPL_CH12.04STSI_12.04.370SINOICRE 12.04.370] if they're not cleared appropriately. Typically, the parking lot is not cleared (except for a small portion near the entrance). | * Contract a firm to handle snow removal from November through March. We must clear the sidewalks; the club will violate city ordinances [https://library.municode.com/mi/livonia/codes/code_of_ordinances?nodeId=CO_TIT12STSIPUPL_CH12.04STSI_12.04.370SINOICRE 12.04.370] if they're not cleared appropriately. Typically, the parking lot is not cleared (except for a small portion near the entrance). | ||
* Drain the power washer pump and hose. Add fuel stabilizer. Perform seasonal engine maintenance as needed (changing oil and plugs). | * Drain the power washer pump and hose. Add fuel stabilizer. Perform seasonal engine maintenance as needed (changing oil and plugs). | ||
* Move test and calibration reagents off-site to a location not subject to freezing temperatures. | * Move test and calibration reagents off-site to a location not subject to freezing temperatures. | ||