We must perform the following tasks (in no particular order) after Labor Day but before the onset of freezing temperatures.
We must perform the following tasks (in no particular order) after Labor Day but before the onset of freezing temperatures.


* Confirm pool closing and winterization with the contractor.  Usually, the contractor will reach out before Labor Day with a scheduled closing date.  Once winterization is complete, we will shut off water to the building.
* Be on-site for pool closing and winterization with the contractor.
** Ensure that all parts removed (particularly in the pump house) are properly stored/labeled.  In the past, some parts have been lost, adding cost and delays to opening.
** Ensure that all parts removed (particularly in the pump house) are properly stored/labeled.  In the past, some parts have been lost, adding cost and delays to opening.
** Identify any issues the contractor finds and make plans to resolve by the next season's opening.
** Identify any issues found and make plans to resolve by the next season's opening.
* Turn off the water gate valve at the street and request water meter removal by the city.
* Turn off all labeled seasonal circuits in the pump house breaker panel.  Ensure that the sump pump and dusk-to-dawn lighting circuits remain on year-round.
* Remove and store the pH and ORP probes off-site per the manufacturer's recommendations (must be kept in solution and above-freezing temperatures).
* Turn the [[Water Gate Valve|water gate valve]] at the street and request water meter removal by the city.
* Remove and store the pH and ORP probes off-site per the manufacturer's recommendations (must be kept in solution and above freezing temperatures).
* Remove the ceiling fans from the large pavilion.  As of 2020, duplicate mounts have been installed in the basement ceiling joists for safe storage.  Removing the fans is very important; high winds during winter can cause the fans to rotate at high speeds, damaging fan blades and/or the vinyl ceiling of the pavilion.
* Remove the ceiling fans from the large pavilion.  As of 2020, duplicate mounts have been installed in the basement ceiling joists for safe storage.  Removing the fans is very important; high winds during winter can cause the fans to rotate at high speeds, damaging fan blades and/or the vinyl ceiling of the pavilion.
* Contract a firm to handle snow removal from November through March.  We must clear the sidewalks; the club will violate city ordinances [https://library.municode.com/mi/livonia/codes/code_of_ordinances?nodeId=CO_TIT12STSIPUPL_CH12.04STSI_12.04.370SINOICRE 12.04.370] if they're not cleared appropriately.  Typically, the parking lot is not cleared (except for a small portion near the entrance).
* Contract a firm to handle snow removal from November through March.  We must clear the sidewalks; the club will violate city ordinances [https://library.municode.com/mi/livonia/codes/code_of_ordinances?nodeId=CO_TIT12STSIPUPL_CH12.04STSI_12.04.370SINOICRE 12.04.370] if they're not cleared appropriately.  Typically, the parking lot is not cleared (except for a small portion near the entrance).