Asset Registry: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 22: Line 22:
|Awning
|Awning
|1997
|1997
|-
|Computer
|2021
|None
|5
|style="background:#FFEB9C|5
|-
|-
|Privacy Fence
|Privacy Fence
Line 34: Line 40:
|Installed in 2020, minor repairs in 2021.
|Installed in 2020, minor repairs in 2021.
|-
|-
|Foundation/Basement
|Gutters
|1966
|Unknown
|2021
|Unknown
|20
|20
|style="background:#C6EFCE|20
|style="background:#FFC7CE|None
|
|
|TBD
|
|
|
|
|$16,000
|Gutters are in disrepair (leaking) and should be replacedThe plan is for the 5-10 year window (as of 2021).  Had quotes in 2020 - need to locate for reference.
|Installed a new internal weeping tile system and sump pumpPainted basement walls with Liquid Rubber and Drylok.
|-
|-
|Hand Dryers
|Hand Dryers
Line 59: Line 65:
|Propose replacing 2 restroom exterior doors (failing) and 3 interior restroom doors (men's and women's) 1-5 years.  Propose replacing all others - 2 exterior doors and 2 interior doors in 10-15 years.
|Propose replacing 2 restroom exterior doors (failing) and 3 interior restroom doors (men's and women's) 1-5 years.  Propose replacing all others - 2 exterior doors and 2 interior doors in 10-15 years.
|-
|-
|Windows
|PA Amplifier
|2020
|-
|-
|Toilets
|Toilets
Line 82: Line 89:
|$1,600
|$1,600
|Numerous toilet valves were replaced in 2021.  Rebuild kits may work to a point; replacement is suggested after numerous rebuilds.
|Numerous toilet valves were replaced in 2021.  Rebuild kits may work to a point; replacement is suggested after numerous rebuilds.
|-
|UPS Batteries<br>(Front Desk)
|2020
|-
|-
|Showers
|Showers
Line 93: Line 103:
|
|
|
|
|-
|Windows
|-
|-
!colspan="10"|Snack Shack
!colspan="10"|Snack Shack
Line 159: Line 171:
|-
|-
|Basement Stand-up Freezer
|Basement Stand-up Freezer
|-
|Foundation/Walls
|1966
|2021
|20
|style="background:#C6EFCE|20
|
|TBD
|
|$16,000
|Installed a new internal weeping tile system and sump pump in 2021.  Assume that after 20 years, the system may need to be replaced (again).  Painted basement walls with Liquid Rubber and Drylok in 2021.  Hydrostatic pressure is causing a bulge to appear on the east wall (near the staircase).  TBD cost to address in the 5-10 year window (as of 2021) unless movement/cracking makes the project more urgent.
|-
|-
|Water Heater
|Water Heater
|2007
|2007
|TBD
|10
|TBD
|
|
|
|
|Need to confirm the age of the water heater.
|-
|-
|Dehumidifier #1
|Dehumidifier #1
|2020
|2020
|None
|5
|style="background:#FFEB9C|4
|$330
|$380
|$420
|$480
|
|-
|-
|Dehumidifier #2
|Dehumidifier #2
|2021
|2021
|None
|5
|style="background:#FFEB9C|5
|$340
|$380
|$430
|$490
|
|-
|-
|Main Distribution Panel
|Main Distribution Panel
|1966
|1966
|-
|Tempering Valve
|2020
|-
|UPS Batteries (Network)
|2020
|-
|-
|Basement Breaker Panel (RLP-2)
|Basement Breaker Panel (RLP-2)
Line 205: Line 258:
|Basketball Poles
|Basketball Poles
|2018
|2018
|-
|Surface
|Unknown
|Unknown
|5
|style="background:#FFC7CE|None
|
|$82,000
|
|
|
|-
|-
!colspan="10"|Pool
!colspan="10"|Pool
|-
|-
|Cover
|Cover
|2016
|None
|TBD
|TBD
|
|
|
|
|Need to determine the expected lifetime.  No replacement is planned in the 1-5 year term.
|-
|Diving Board
|Unknown
|2020
|-
|Lane Markers
|-
|-
|Marcite
|Marcite
Line 215: Line 294:
|10
|10
|style="background:#FFC7CE|None
|style="background:#FFC7CE|None
|$100,000
|
|$128,000
|
|Pricing subject to further review; a budgetary estimate.  The plan for 2022 replacement is being developed [[Pool Marcite#Plan for 2022|here]].  Assume some amount of marcite replacement is necessary every 10 years.
|-
|Slides
|2015
|-
|-
|Starting Block Anchors
|Starting Block Anchors
Line 235: Line 322:
|-
|-
!colspan="10"|Grounds
!colspan="10"|Grounds
|-
|Patio Set
|-
|-
|Parking Lot
|Parking Lot
Line 246: Line 335:
|$20,800
|$20,800
|The asphalt parking lot was first installed in 2000.  Maintenance is necessary every 5-7 years (largely subject to weather).  Maintenace was known to have been performed in [[Club History#2015|2015]] and 2020.  Cost for 2025, 2030, 2035, and 2040 is based on the prior estimate (for 2020) with inflation.
|The asphalt parking lot was first installed in 2000.  Maintenance is necessary every 5-7 years (largely subject to weather).  Maintenace was known to have been performed in [[Club History#2015|2015]] and 2020.  Cost for 2025, 2030, 2035, and 2040 is based on the prior estimate (for 2020) with inflation.
|-
|Picnic Tables - Plastic
|-
|Picnic Tables - Wooden
|-
|-
|Play Structure
|Play Structure
Line 252: Line 345:
|Shed
|Shed
|1986
|1986
|2021
|-
|Water Gate Valve
|2021
|-
|Volleyball Net
|2021
|2021
|-
|-
Line 297: Line 396:
|Main Pump
|Main Pump
|
|
|-
|Main Pump Motor
|2016
|None
|10
|style="background:#FFC7CE|5
|
|$1,700
|
|$2,200
|The main pump motor is a 15 HP 230 VAC unit, as detailed [[Pool Main Pump Motor|here]].
|-
|Piping (Post Pump)
|2021
|-
|Piping (Pre Pump)
|-
|Piping (Surge Tank)
|-
|Probe (pH)
|2020
|2021
|3
|style="background:#FFC7CE|2
|$140
|$160
|$180
|$200
|Typically, the [[Chemtrol_Pool_Controller#Chemical_Probes|pH probes]] are rated to last a single year.  However, with proper usage, [[Probe Calibration|calibration]] and off-season storage, it's assumed they'll last 2-3 years.
|-
|Probe (ORP)
|2020
|2021
|3
|style="background:#FFC7CE|2
|$220
|$240
|$280
|$310
|Typically, the [[Chemtrol_Pool_Controller#Chemical_Probes|ORP probes]] are rated to last a single year.  However, with proper usage, [[Probe Calibration|calibration]] and off-season storage, it's assumed they'll last 2-3 years.
|-
|-
|Sump Pump
|Sump Pump