Line 374: Line 374:
|Play Structure
|Play Structure
|2016
|2016
|None
|20
|style="background:#C6EFCE|15
|
|TBD
|
|TBD
|The present Miracle Recreation play structure (and swing sets) were installed in 2016.  Miracle recommends playground updates every 8-10 years; playgrounds can last 10-20 or more years dependent upon weather and usage.  An estimated replacement date of 20 years is given, though the equipment may last longer.  Regular inspections must be performed.  Assume some maintenance cost within 5-10 years (from 2021).
|-
|-
|Privacy Fence
|Privacy Fence
Line 392: Line 400:
|Water Gate Valve
|Water Gate Valve
|2021
|2021
|None
|40
|style="background:#C6EFCE|40
|
|
|
|
|The prior gate valve lasted about 40 years before showing issues; it is assumed that the [[Water Gate Valve#History|new gate valve]] will have a similar lifespan.  No planned maintenance or replacement prior to 2061.
|-
|-
|Volleyball Net
|Volleyball Net
Line 405: Line 421:
|Acid Pump
|Acid Pump
|2017
|2017
|Unknown
|10
|style="background:#C6EFCE|6
|
|
|
|
|The acid pump is a Stenner 45M5.  The replacement cost in 2021 is about $400.
|-
|-