Asset Registry: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 522: Line 522:
|TBD
|TBD
|Some regular chairs are in need of repair/replacement.  As of the manager's last accounting in 2021, of the 29 regular chairs, 9 are in need of repair.  Numbers to be confirmed.  A plan should be formed to begin staged replacement.  Coordination with other area clubs may be cost beneficial.
|Some regular chairs are in need of repair/replacement.  As of the manager's last accounting in 2021, of the 29 regular chairs, 9 are in need of repair.  Numbers to be confirmed.  A plan should be formed to begin staged replacement.  Coordination with other area clubs may be cost beneficial.
|-
|Concrete
|1967
|2018
|30
|TBD
|TBD
|TBD
|TBD
|TBD
|Portions of the concrete pool deck presumably date back to the original installation in [[Club History#1967|1967]].  Multiple repairs and deck replacements have been made since then.  As of 2021, the most recent work appears to have occurred in [[Club History#1998|1998]], [[Club History#2017|2017]] and [[Club History#2018|2018]].  Regular future maintenance is anticipated; the cost is TBD.
|-
|-
|Fence
|Fence

Navigation menu