Asset Registry: Difference between revisions

Jump to navigation Jump to search
no edit summary
No edit summary
No edit summary
Line 5: Line 5:
{| class="wikitable"
{| class="wikitable"
!rowspan="2"|Item
!rowspan="2"|Item
!colspan="4"|Life Cycle (Years)
!colspan="4"|Life Cycle (Years)c
!colspan="4"|Required Future<br>Investment
!colspan="4"|Required Future<br>Investment
!rowspan="2"|Comment
!rowspan="2"|Comment
Line 197: Line 197:
|
|
|A regular refresh cycle for the front-desk computer is planned.  The replacement cost is TBD (donated/retired business PCs preferred).
|A regular refresh cycle for the front-desk computer is planned.  The replacement cost is TBD (donated/retired business PCs preferred).
|-
|Drywall (Lobby Ceiling)
|Unknown
|Unknown
|TBD
|TBD
|TBD
|
|
|
|
|The ceiling drywall in the lobby is failing near the north end.  Much like in the snack shack and family restroom, replacement will be necessary.  The cost is to be determined.
|-
|-
|Electrical
|Electrical

Navigation menu