→Late March to Early April: Water and Pool Opening
Matt Parnell (talk | contribs) No edit summary |
Matt Parnell (talk | contribs) |
||
| Line 37: | Line 37: | ||
** We will open the water valves, supplying the clubhouse and pump house at this time. To avoid flooding, multiple valves and pipe assemblies <u>must</u> be re-assembled before this to avoid flooding. | ** We will open the water valves, supplying the clubhouse and pump house at this time. To avoid flooding, multiple valves and pipe assemblies <u>must</u> be re-assembled before this to avoid flooding. | ||
** During the opening, the cover will be removed, folded, and placed on the deck. It is the responsibility of B&G to move and store it in the shed. | ** During the opening, the cover will be removed, folded, and placed on the deck. It is the responsibility of B&G to move and store it in the shed. | ||
* Lubricate the pump motor using the grease gun located in the pump house. | * Lubricate the pump motor using the grease gun located in the pump house. Follow [[Pool Main Pump Motor#Lubrication|this procedure]]. | ||
* Clean, [[Probe Calibration|calibrate]], install and verify proper operation of the pH and ORP probes. Probes are expected to last 1-3 years between replacement. | * Clean, [[Probe Calibration|calibrate]], install and verify proper operation of the pH and ORP probes. Probes are expected to last 1-3 years between replacement. | ||
* Unplug sump pump discharge line heat tapes (optional). | * Unplug sump pump discharge line heat tapes (optional). | ||