Board Building and Grounds: Difference between revisions

Line 14: Line 14:
** A large quantity of Accutabs (calcium hypochlorite) and hydrochloric (muriatic) acid will be required.  To a lesser extent (depending upon existing inventory), calcium chloride, sodium bicarbonate and  stabilizer will be needed.  A new (Taylor) test kit is always required for the season.
** A large quantity of Accutabs (calcium hypochlorite) and hydrochloric (muriatic) acid will be required.  To a lesser extent (depending upon existing inventory), calcium chloride, sodium bicarbonate and  stabilizer will be needed.  A new (Taylor) test kit is always required for the season.


=== Water and Pool Opening ===
=== Late March to Early April: Water and Pool Opening ===


* Request water meter installation via the City of Livonia.  The city installs approximately 1,500 seasonal meters, so request early.  Typically, meter installation begins in late March.
* Request water meter installation via the City of Livonia.  The city installs approximately 1,500 seasonal meters, so request early.  Typically, meter installation begins in late March.