Board Building and Grounds: Difference between revisions
→Water and Pool Opening
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) |
||
| Line 14: | Line 14: | ||
** A large quantity of Accutabs (calcium hypochlorite) and hydrochloric (muriatic) acid will be required. To a lesser extent (depending upon existing inventory), calcium chloride, sodium bicarbonate and stabilizer will be needed. A new (Taylor) test kit is always required for the season. | ** A large quantity of Accutabs (calcium hypochlorite) and hydrochloric (muriatic) acid will be required. To a lesser extent (depending upon existing inventory), calcium chloride, sodium bicarbonate and stabilizer will be needed. A new (Taylor) test kit is always required for the season. | ||
=== Water and Pool Opening === | === Late March to Early April: Water and Pool Opening === | ||
* Request water meter installation via the City of Livonia. The city installs approximately 1,500 seasonal meters, so request early. Typically, meter installation begins in late March. | * Request water meter installation via the City of Livonia. The city installs approximately 1,500 seasonal meters, so request early. Typically, meter installation begins in late March. | ||