In an effort to better understand and document projects and events in the club's history, this page has been created and shall be updated as new information becomes available. This will help future board members better understand the club's history (particularly in the context of necessary improvements). | |||
The items below have been pulled from newsletters, city records and discussions with past board members. | |||
==1986== | ==1986== | ||
* The shed was constructed adjacent to the pump house. | * The shed was constructed adjacent to the pump house. | ||
==1990== | |||
* An unknown plumbing project (permit #PP201). | |||
==1995== | |||
* An unknown electrical upgrade (permit #PE12929 for "INGROUND POOL Comm"). | |||
* An unknown plumbing project (permit #PP7498 via "A W SMITH NO"). | |||
==1996== | ==1996== | ||
* Trusses were erected over an "existing flat roof". Small pavilion? | * Trusses were erected over an "existing flat roof". Small pavilion? | ||
==1997== | |||
* Installed a galvanized steel and vinyl "FAIRWAY FARMS" awning. | |||
==1998== | |||
* Concrete replacement (pool deck)? | |||
==1999== | |||
* Installed 3 BBQ gas grills. | |||
==2000== | |||
* Installation of a new asphalt parking lot - includes storm sewer work. | |||
==2007== | |||
* Changed electrical service (added upstairs panel?). | |||
* Installed 2 electric hand dryers. | |||
* Installed 5 BBQ gas grills (assumed). | |||
* Installed a new water heater - included work on 4 lavatory fixtures and 9 showers. | |||
==2008== | ==2008== | ||
* The large non-enclosed pavilion (36 ft x 60 ft) was constructed. Plans were submitted to the city in late 2007. | * The large non-enclosed pavilion (36 ft x 60 ft) was constructed. Plans were submitted to the city in late 2007. | ||
==2009== | |||
* Added ground bonding (pool safety) to various items in the pump house. | |||
==2013== | ==2013== | ||
| Line 25: | Line 65: | ||
* A building (TBD) was stripped and re-shingled (15# felt, drip edge, eave flashing w/ venting to code). | * A building (TBD) was stripped and re-shingled (15# felt, drip edge, eave flashing w/ venting to code). | ||
* Installed a new 48" tall open iron picket fence (replaced a 54" chain link fence). | |||