Club History: Difference between revisions

Jump to navigation Jump to search
No edit summary
Line 81: Line 81:
* Locks re-keyed.
* Locks re-keyed.
* New playscape and swing set installed.
* New playscape and swing set installed.
* Problems noted with 4 of the 6 starting block anchors.
* Marcite patched in the shallow pool near the threshold to the deeper pool.
* Replaced 2 pool light bulbs & gaskets.
* Replaced two pool light fixtures.
* Repaired diving board fulcrum.
* Repaired Chemtrol PC-2100 (exact issue not known), installed new flow switch.
* Issue with main drain valve noted upon closing.


==2017==
==2017==

Navigation menu