Club History: Difference between revisions
Jump to navigation
Jump to search
no edit summary
Matt Parnell (talk | contribs) (→2018) |
Matt Parnell (talk | contribs) No edit summary |
||
| Line 3: | Line 3: | ||
The items below have been pulled from newsletters, invoices, city records and discussions with past board members. It's a work in progress. | The items below have been pulled from newsletters, invoices, city records and discussions with past board members. It's a work in progress. | ||
=1966= | |||
* The club was built. | * The club was built. | ||
=1986= | |||
* The shed was constructed adjacent to the pump house. | * The shed was constructed adjacent to the pump house. | ||
=1990= | |||
* An unknown plumbing project (permit #PP201). | * An unknown plumbing project (permit #PP201). | ||
=1995= | |||
* An unknown electrical upgrade (permit #PE12929 for "INGROUND POOL Comm"). | * An unknown electrical upgrade (permit #PE12929 for "INGROUND POOL Comm"). | ||
* An unknown plumbing project (permit #PP7498 via "A W SMITH NO"). | * An unknown plumbing project (permit #PP7498 via "A W SMITH NO"). | ||
=1996= | |||
* Trusses were erected over an "existing flat roof". Small pavilion? | * Trusses were erected over an "existing flat roof". Small pavilion? | ||
=1997= | |||
* Installed a galvanized steel and vinyl "FAIRWAY FARMS" awning. | * Installed a galvanized steel and vinyl "FAIRWAY FARMS" awning. | ||
=1998= | |||
* Concrete replacement (pool deck)? | * Concrete replacement (pool deck)? | ||
=1999= | |||
* Installed 3 BBQ gas grills. | * Installed 3 BBQ gas grills. | ||
=2000= | |||
* Installation of a new asphalt parking lot - includes storm sewer work. | * Installation of a new asphalt parking lot - includes storm sewer work. | ||
=2007= | |||
* Changed electrical service (added upstairs panel?). | * Changed electrical service (added upstairs panel?). | ||
| Line 47: | Line 47: | ||
* Installed a new water heater - included work on 4 lavatory fixtures and 9 showers. | * Installed a new water heater - included work on 4 lavatory fixtures and 9 showers. | ||
=2008= | |||
* The large non-enclosed pavilion (36 ft x 60 ft) was constructed. Plans were submitted to the city in late 2007. | * The large non-enclosed pavilion (36 ft x 60 ft) was constructed. Plans were submitted to the city in late 2007. | ||
=2009= | |||
* Added ground bonding (pool safety) to various items in the pump house. | * Added ground bonding (pool safety) to various items in the pump house. | ||
=2013= | |||
* The locker rooms, club house and some exterior areas were painted. | * The locker rooms, club house and some exterior areas were painted. | ||
| Line 66: | Line 66: | ||
* Discussed a new roof roof, chlorinator and other improvements. | * Discussed a new roof roof, chlorinator and other improvements. | ||
=2014= | |||
* A building (TBD) was stripped and re-shingled (15# felt, drip edge, eave flashing w/ venting to code). | * A building (TBD) was stripped and re-shingled (15# felt, drip edge, eave flashing w/ venting to code). | ||
* Installed a new 48" tall open iron picket fence (replaced a 54" chain link fence). | * Installed a new 48" tall open iron picket fence (replaced a 54" chain link fence). | ||
=2015= | |||
* The parking lot was resealed in the fall (should be performed again in 5-7 years). | * The parking lot was resealed in the fall (should be performed again in 5-7 years). | ||
=2016= | |||
* First full winter of use with the new pool cover (better water quality, less debris, no need to acid-clean the marcite and conserves water). | * First full winter of use with the new pool cover (better water quality, less debris, no need to acid-clean the marcite and conserves water). | ||
| Line 89: | Line 89: | ||
* Issue with main drain valve noted upon closing. | * Issue with main drain valve noted upon closing. | ||
=2017= | |||
* Several sections of the concrete pool deck were replaced. | * Several sections of the concrete pool deck were replaced. | ||
| Line 105: | Line 105: | ||
* DTE replaced transformer due to 3-phase power failure. | * DTE replaced transformer due to 3-phase power failure. | ||
=2018= | |||
* No major capital improvements. | * No major capital improvements. | ||
| Line 119: | Line 119: | ||
* Broken line in sump pump drain (exterior) noted. | * Broken line in sump pump drain (exterior) noted. | ||
=2019= | |||
* No major capital improvements. | * No major capital improvements. | ||
| Line 125: | Line 125: | ||
* Minor painting touch-up around the grounds and clubhouse. | * Minor painting touch-up around the grounds and clubhouse. | ||
* It was noted that the water gate valve was leaking and repair would be needed. | * It was noted that the water gate valve was leaking and repair would be needed. | ||
=2020= | |||
Projects for 2020 are detailed [https://www.fairwayfarmsswimclub.com/projects-2020/ here]. | |||