Board Building and Grounds: Difference between revisions

Jump to navigation Jump to search
Line 36: Line 36:
** The water valves, supplying the club house and pump house will be opened at this time.  Note that multiple valves and pipe assemblies <u>must</u> be re-assembled prior to this to avoid flooding.
** The water valves, supplying the club house and pump house will be opened at this time.  Note that multiple valves and pipe assemblies <u>must</u> be re-assembled prior to this to avoid flooding.
** During opening, the cover will be removed, folded and placed on the deck.  It is the responsibility of B&G to move and store it in the shed.
** During opening, the cover will be removed, folded and placed on the deck.  It is the responsibility of B&G to move and store it in the shed.
* Lubricate the pump motor using the grease gun located in the pump house.  Use Mobil Polyrex EM (or equivalent Polyurea grease for electric motors), 3-4 pumps per port (i.e. front and rear of motor).  Lubrication should be performed twice per season.


=== Early May: Coordinate Spring Clean-Up ===
=== Early May: Coordinate Spring Clean-Up ===

Navigation menu