Board Building and Grounds: Difference between revisions

Jump to navigation Jump to search
No edit summary
Line 59: Line 59:
* Assemble, clean and test the gas grills.  The gas supply valve is in the basement utility room.
* Assemble, clean and test the gas grills.  The gas supply valve is in the basement utility room.
* Install the large umbrella.  The folding mechanism may need to be lubricated.
* Install the large umbrella.  The folding mechanism may need to be lubricated.
=== Mid May: Prepare for Opening ===
* Start regular dumpster pickup service (once per week on Friday).  If needed, the pickup frequency may need to be increased to twice per week (Friday and Monday) to accommodate the extra waste generated during busy weekends.


== Operating Tasks ==
== Operating Tasks ==

Navigation menu