* The boiler must be inspected per the insurance company and state.  The inspector that visited in August 2020 indicated that the next inspection would not be due until 2023.  A CSD-1 form must be filled out as part of (or prior to the inspection).  This form is to be kept on-file both near the boiler and in a binder in the club house.
* The boiler must be inspected per the insurance company and state.  The inspector that visited in August 2020 indicated that the next inspection would not be due until 2023.  A CSD-1 form must be filled out as part of (or prior to the inspection).  This form is to be kept on-file both near the boiler and in a binder in the club house.
== Hiring Contractors ==
In general, the preference is to "hire within" and utilize the skills of the members to complete work.  However, some tasks require licensed professionals and/or are outside the capabilities of the members.
All work should be approved by the board (or a subset of the board, where appropriate) prior to project kick-off.  For large projects (particularly those above $1,500), three bids should be obtained.  This is subject to the discretion of the board; some jobs may requiring hiring a specific contractor, for instance.
As requested by the treasurer, all contractors must provide a <b>Certificate of Insurance</b> prior to arriving for work.  In addition, the following are requested where possible:
* General Liability Policy
* Hired Auto or Non-Owned Auto Policy
* Workers' Compensation
* Umbrella Policy
* Additional Insured (not common)
* Waiver of Subrogation (not common)
A W-9 is also necessary for tax purposes (may not necessarily need to provide up-front).  The official name of the club is "Fairway Farms Swim & Tennis Club, Inc.", where needed.