To fully address the [[#Known Deficiencies|known deficiencies]], an overhaul of the surge tank is planned as the budget permits. | To fully address the [[#Known Deficiencies|known deficiencies]], an overhaul of the surge tank is planned as the budget permits. | ||
=== Isolation Valves === | |||
There are three isolation valves to be replaced. Details to follow. | |||
=== Maintenance Drain Valves === | |||
There are three maintenance drain valves - not to be confused with the pool drain return valve(s). Details to follow. | |||
=== Modulating Drain Valve === | === Modulating Drain Valve === | ||
| Line 150: | Line 158: | ||
This actuator has been purchased as of January 2022 and is awaiting installation. | This actuator has been purchased as of January 2022 and is awaiting installation. | ||
=== Piping === | |||
Details to follow. | |||
=== Structural and Surface === | |||
Details to follow. | |||