Surge Tank: Difference between revisions

No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 62: Line 62:


To fully address the [[#Known Deficiencies|known deficiencies]], an overhaul of the surge tank is planned as the budget permits.
To fully address the [[#Known Deficiencies|known deficiencies]], an overhaul of the surge tank is planned as the budget permits.
=== Isolation Valves ===
There are three isolation valves to be replaced.  Details to follow.
=== Maintenance Drain Valves ===
There are three maintenance drain valves - not to be confused with the pool drain return valve(s).  Details to follow.


=== Modulating Drain Valve ===
=== Modulating Drain Valve ===
Line 150: Line 158:


This actuator has been purchased as of January 2022 and is awaiting installation.
This actuator has been purchased as of January 2022 and is awaiting installation.
=== Piping ===
Details to follow.
=== Structural and Surface ===
Details to follow.