→Late March to Early April: Water and Pool Opening
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) |
||
| Line 31: | Line 31: | ||
** Once the water meter is installed, it is <u>our responsibility</u> to open the gate valve near the street. The city will <u>no longer</u> support turning the gate valve as of 2021. | ** Once the water meter is installed, it is <u>our responsibility</u> to open the gate valve near the street. The city will <u>no longer</u> support turning the gate valve as of 2021. | ||
** Do not turn on the water in the building at this point; doing so may void any warranty or guarantee provided by the contractor during winterization. | ** Do not turn on the water in the building at this point; doing so may void any warranty or guarantee provided by the contractor during winterization. | ||
* Coordinate pool opening with the contractor | * Coordinate pool opening with the contractor. | ||
** The water meter must be installed first. | ** The water meter must be installed first. | ||
** The pool should be opened at least one week prior to the club's opening day. Ideally, it should be opened much earlier (in April) to provide sufficient time to balance chemicals, solve issues, etc. | ** The pool should be opened at least one week prior to the club's opening day. Ideally, it should be opened much earlier (in April) to provide sufficient time to balance chemicals, solve issues, etc. | ||