→Early May: Coordinate Spring Clean-Up
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) |
||
| Line 44: | Line 44: | ||
The spring clean up is an effort led by B&G along with the board. It is typically scheduled for the first or second Saturday in May. Historically, a boys and girls swim team is hired to do a bulk of the work. Members are encouraged to participate as well. | The spring clean up is an effort led by B&G along with the board. It is typically scheduled for the first or second Saturday in May. Historically, a boys and girls swim team is hired to do a bulk of the work. Members are encouraged to participate as well. | ||
==== Preparation and Notes ==== | |||
* Order mulch, as needed. | * Order mulch, as needed. The recommended amount is 11 to 15 yards of hardwood mulch. | ||
* Purchase leaf bags as needed (check the shed first). Have at least 30-40 on hand. | |||
* Ensure that the following supplies are available: | |||
* Purchase leaf bags. | ** Rakes, shovels, trowels, leaf blower(s) and extension cords. | ||
* Ensure that the | ** Buckets, scrub brushes and soap (for cleaning pavilion tables, pool deck furniture). | ||
** Wheelbarrows (to haul mulch/sand; may need to borrow additional from members). | |||
** Work gloves (club has an assortment on-hand; individuals may want to bring their own). | |||
* The hired lawn crew does not trim trees or maintain landscape beds - this should be part of the clean-up. | * The hired lawn crew does not trim trees or maintain landscape beds - this should be part of the clean-up. | ||
* | * Power washing the pool deck in advance may be desirable (before chairs/lounges are placed). | ||
* | |||
==== Swim Team Tasks ==== | |||
B&G is responsible for guiding the swim team effort, which may include: | |||
* Move pool deck furniture from the pavilion to the pool deck. | |||
* Move the fire pit, pavilion tables, etc., in preparation for power washing. | |||
* Wash and scrub pool deck furniture with soap. | |||
* Spread mulch. | |||
** Ensure sufficient coverage on the playground. | |||
** Make sure excessive mulch is not piled up against the clubhouse masonry. | |||
** Spread elsewhere on the property, especially within fenced-in areas. | |||
* Haul and spread sand to the volleyball and tetherball courts (as needed - may not need be done every year). | |||
* Move chemical supplies to pump house (chlorine tab buckets) and shed (acid boxes/bottles). | |||
* Move pool cover into shed. | |||
* Haul scrap materials from off-season projects as needed. | |||
* Place wooden picnic tables around grounds. | |||
* Clean up leaves, sticks, etc., from the grounds. | * Clean up leaves, sticks, etc., from the grounds. | ||
* Clean the | * Clean debris/weeds out of gravel around pump house, perimeter of pool. | ||
* Clean and distribute trash and bottle recycling receptacles. | |||
* Pull weeds. | |||
==== Member and Board Tasks ==== | |||
The tasks below are recommended on an annual basis. Additional tasks and projects may be added as needed. | |||
* Thoroughly clean the club house, pump house and shed (in decreasing order of priority). | |||
* Power wash all concrete surfaces (including the front pad between door and driveway). | |||
* Install ceiling fans in the large pavilion (stored in the basement). | * Install ceiling fans in the large pavilion (stored in the basement). | ||
* Install tennis, volleyball and tetherball nets. | * Install tennis, volleyball and tetherball nets. | ||
* Assemble, clean and test the gas grills. The gas supply valve is in the basement utility room. | * Assemble, clean and test the gas grills. The gas supply valve is in the basement utility room. | ||
* Install the large umbrella. The folding mechanism may need to be lubricated. | * Install the large umbrella. The folding mechanism may need to be lubricated. | ||
* Scrape (power wash) paint and/or repair hardware on wooden picnic tables (may not be needed every year). | |||
* Trim bushes and trees. | |||
* Plant flowers (this may be delayed until mid-May to avoid frost risk). | |||
=== Mid May: Prepare for Opening === | === Mid May: Prepare for Opening === | ||