Surge Tank: Difference between revisions

Tag: Manual revert
Line 62: Line 62:


To fully address the [[#Known Deficiencies|known deficiencies]], an overhaul of the surge tank is planned as the budget permits.
To fully address the [[#Known Deficiencies|known deficiencies]], an overhaul of the surge tank is planned as the budget permits.
=== Isolation Valves ===
There are three isolation valves to be replaced.  Details to follow.
=== Maintenance Drain Valves ===
There are three maintenance drain valves - not to be confused with the pool drain return valve(s).  Details to follow.


=== Modulating Drain Valve ===
=== Modulating Drain Valve ===