Board Building and Grounds: Difference between revisions

Line 85: Line 85:
* Powerwash all concrete surfaces (including the front pad between door and driveway).
* Powerwash all concrete surfaces (including the front pad between door and driveway).
* Install ceiling fans in the large pavilion (stored in the basement).
* Install ceiling fans in the large pavilion (stored in the basement).
* Install tennis, volleyball, and tetherball nets.
* Install tennis and volleyball nets.  Install the tetherball.
* Assemble, clean, and test the gas grills.  The gas supply valve is in the basement utility room.
* Assemble, clean, and test the gas grills.  The gas supply valve is in the basement utility room.
* Install the large umbrella.  The folding mechanism may need to be lubricated.
* Install the large umbrella.  The folding mechanism may need to be lubricated.