Asset Registry: Difference between revisions
no edit summary
Matt Parnell (talk | contribs) No edit summary |
Matt Parnell (talk | contribs) No edit summary |
||
| Line 5: | Line 5: | ||
{| class="wikitable" | {| class="wikitable" | ||
!rowspan="2"|Item | !rowspan="2"|Item | ||
!colspan="4"|Life Cycle (Years) | !colspan="4"|Life Cycle (Years)c | ||
!colspan="4"|Required Future<br>Investment | !colspan="4"|Required Future<br>Investment | ||
!rowspan="2"|Comment | !rowspan="2"|Comment | ||
| Line 197: | Line 197: | ||
| | | | ||
|A regular refresh cycle for the front-desk computer is planned. The replacement cost is TBD (donated/retired business PCs preferred). | |A regular refresh cycle for the front-desk computer is planned. The replacement cost is TBD (donated/retired business PCs preferred). | ||
|- | |||
|Drywall (Lobby Ceiling) | |||
|Unknown | |||
|Unknown | |||
|TBD | |||
|TBD | |||
|TBD | |||
| | |||
| | |||
| | |||
| | |||
|The ceiling drywall in the lobby is failing near the north end. Much like in the snack shack and family restroom, replacement will be necessary. The cost is to be determined. | |||
|- | |- | ||
|Electrical | |Electrical | ||