Board Building and Grounds: Difference between revisions
→Late March to Early April: Water and Pool Opening
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) |
||
| Line 36: | Line 36: | ||
** The water valves, supplying the club house and pump house will be opened at this time. Note that multiple valves and pipe assemblies <u>must</u> be re-assembled prior to this to avoid flooding. | ** The water valves, supplying the club house and pump house will be opened at this time. Note that multiple valves and pipe assemblies <u>must</u> be re-assembled prior to this to avoid flooding. | ||
** During opening, the cover will be removed, folded and placed on the deck. It is the responsibility of B&G to move and store it in the shed. | ** During opening, the cover will be removed, folded and placed on the deck. It is the responsibility of B&G to move and store it in the shed. | ||
* Lubricate the pump motor using the grease gun located in the pump house. Use Mobil Polyrex EM (or equivalent Polyurea grease for electric motors), 3-4 pumps per port (i.e. front and rear of motor). Lubrication should be performed twice per season. | |||
=== Early May: Coordinate Spring Clean-Up === | === Early May: Coordinate Spring Clean-Up === | ||