Board Building and Grounds: Difference between revisions

Jump to navigation Jump to search
Line 105: Line 105:


=== Early September: Closing Activities ===
=== Early September: Closing Activities ===
Unless otherwise requested, the pool and club are typically shut down shortly after Labor Day.


* Remove the ceiling fans from the large pavilion.  As of 2020, duplicate mounts have been installed in the basement ceiling joists for safe storage.  Removing the fans is very important; high winds during winter can cause the fans to rotate at high speeds, damaging fan blades and/or the vinyl ceiling of the pavilion.
* Remove the ceiling fans from the large pavilion.  As of 2020, duplicate mounts have been installed in the basement ceiling joists for safe storage.  Removing the fans is very important; high winds during winter can cause the fans to rotate at high speeds, damaging fan blades and/or the vinyl ceiling of the pavilion.

Navigation menu