Board Building and Grounds: Difference between revisions

Jump to navigation Jump to search
Line 38: Line 38:
** During the opening, the cover will be removed, folded, and placed on the deck.  It is the responsibility of B&G to move and store it in the shed.
** During the opening, the cover will be removed, folded, and placed on the deck.  It is the responsibility of B&G to move and store it in the shed.
* Lubricate the pump motor using the grease gun located in the pump house.  Use Mobil Polyrex EM (or equivalent Polyurea grease for electric motors), 3-4 pumps per port (i.e. front and rear of the motor).  We should perform lubrication twice per season.
* Lubricate the pump motor using the grease gun located in the pump house.  Use Mobil Polyrex EM (or equivalent Polyurea grease for electric motors), 3-4 pumps per port (i.e. front and rear of the motor).  We should perform lubrication twice per season.
* Clean, calibrate, install and verify proper operation of the pH and ORP probes.  Probes are expected to last 1-3 years between replacement.
* Clean, [[Probe Calibration|calibrate]], install and verify proper operation of the pH and ORP probes.  Probes are expected to last 1-3 years between replacement.


=== Early May: Coordinate Spring Clean-Up ===
=== Early May: Coordinate Spring Clean-Up ===

Navigation menu