The Asset Registry is maintained by Building & Grounds and reviewed by the board. The original version was created by Sally Duffy and the 2020 Capital Assessment Committee. | The Asset Registry is maintained by Building & Grounds and reviewed by the board. The original version was created by Sally Duffy and the 2020 Capital Assessment Committee. | ||
Where possible, inflation is considered (using [https://smartasset.com/investing/inflation-calculator this calculator], for instance). Future investment is a "best guess" based upon past quotes or work, where possible. NOTE: A higher-than-expected inflation rate took effect in 2022. This has not necessarily been factored into calculations (August 2022). Many estimates were made in 2020 and 2021. | Where possible, inflation is considered (using [https://smartasset.com/investing/inflation-calculator this calculator], for instance). Future investment is a "best guess" based upon past quotes or work, where possible. NOTE: A higher-than-expected inflation rate took effect in 2022. This has not necessarily been factored into calculations (August 2022). Many estimates were made in 2020 and 2021. | ||
| Line 18: | Line 16: | ||
== Basement == | == Basement == | ||
{| class="wikitable" | {{Note|type=info|text=This section was partially updated on January 4th, 2025.}} | ||
{| class="wikitable sortable mw-collapsible" | |||
!rowspan="2"|Item | !rowspan="2"|Item | ||
!colspan="4"|Life Cycle (Years) | !colspan="4"|Life Cycle (Years) | ||
| Line 28: | Line 28: | ||
!Last<br>Rehab<br>Year | !Last<br>Rehab<br>Year | ||
!Typical<br>Useful | !Typical<br>Useful | ||
!Estimated<br>Remaining<br>( | !Estimated<br>Remaining<br>(2025) | ||
!1-5<br>Years | !1-5<br>Years | ||
!5-10<br>Years | !5-10<br>Years | ||
| Line 37: | Line 37: | ||
!D | !D | ||
!RPN | !RPN | ||
|- | |||
|Aquastat | |||
|2024 | |||
|None | |||
|20 | |||
|19 | |||
| | |||
| | |||
| | |||
|$500 | |||
|3 | |||
|2 | |||
|3 | |||
|18 | |||
|A Honeywell T775A2009 aquastat (electronic temperature control) was installed on the hot water circulator pump to prevent thermal run-away and support immediate hot water at the sinks and showers. | |||
|- | |- | ||
|Breaker Panel ([[Electrical System#Basement Panel RLP-2|RLP-2]]) | |Breaker Panel ([[Electrical System#Basement Panel RLP-2|RLP-2]]) | ||
| Line 57: | Line 72: | ||
|None | |None | ||
|10 | |10 | ||
|style="background:#C6EFCE| | |style="background:#C6EFCE|6 | ||
| | | | ||
| | | | ||
|$420 | |$420 | ||
| | | | ||
| | |3 | ||
|5 | |5 | ||
|5 | |5 | ||
| | |75 | ||
|The hot water circulator pump is a Grundfos Alpha2 15-55SFC (99163937) stainless steel circulation pump (1/16 HP). The replacement cost is $330 in 2021 (maybe cheaper on surplus). Circulation pumps are cited to last ten years - but as always, subject to environment and use. | |The hot water circulator pump is a Grundfos Alpha2 15-55SFC (99163937) stainless steel circulation pump (1/16 HP). The replacement cost is $330 in 2021 (maybe cheaper on surplus). Circulation pumps are cited to last ten years - but as always, subject to environment and use. As of 2021, it was noted that the circulation function didn't really work correctly. In 2024, an aquastat was added to (finally) address the issues. | ||
|- | |- | ||
|Dehumidifier "A" | |Dehumidifier "A" | ||
| Line 72: | Line 87: | ||
|None | |None | ||
|5 | |5 | ||
|style="background:# | |style="background:#FFC7CE|0 | ||
|$330 | |$330 | ||
|$380 | |$380 | ||
| Line 89: | Line 104: | ||
|None | |None | ||
|5 | |5 | ||
|style="background:# | |style="background:#FFC7CE|1 | ||
|$340 | |$340 | ||
|$380 | |$380 | ||
| Line 160: | Line 175: | ||
|The existing model is an Electrolux KCCF160QWA commercial freezer (15.58 cu ft capacity). This model does not appear to be made anymore; replacement with a KCCF170WH or equivalent (replacement cost in 2021 is about $930; about $1,300 in 2036 with inflation. | |The existing model is an Electrolux KCCF160QWA commercial freezer (15.58 cu ft capacity). This model does not appear to be made anymore; replacement with a KCCF170WH or equivalent (replacement cost in 2021 is about $930; about $1,300 in 2036 with inflation. | ||
|- | |- | ||
|Freezer ( | |Freezer (Upright) | ||
| | |2013 | ||
|None | |None | ||
|20 | |20 | ||
|style="background:# | |style="background:#C6EFCE|11 | ||
| | | | ||
| | | | ||
|TBD | |TBD | ||
| | | | ||
|8 | |||
|2 | |||
|8 | |||
|2 | |||
|2 | |2 | ||
|32 | |32 | ||
| Line 210: | Line 208: | ||
|- | |- | ||
|Network Equipment | |Network Equipment | ||
| | |2024 | ||
| | |2024 | ||
|5 | |5 | ||
|style="background:#FFEB9C|4 | |style="background:#FFEB9C|4 | ||
| Line 222: | Line 220: | ||
|2 | |2 | ||
|30 | |30 | ||
|Some equipment replacement is anticipated every five years due to product end-of-life (EOL), failures, or technology upgrades. The cost is not known at this time. A new PoE network switch was installed in the clubhouse in 2022. NOTE: For the sake of security, specifics about the network are not posted on the Wiki. | |Some equipment replacement is anticipated every five years due to product end-of-life (EOL), failures, or technology upgrades. The cost is not known at this time. A new PoE network switch was installed in the clubhouse in 2022 and again in 2024. NOTE: For the sake of security, specifics about the network are not posted on the Wiki. | ||
|- | |- | ||
|Sump Pump | |Sump Pump | ||
| Line 287: | Line 285: | ||
|- | |- | ||
|} | |} | ||
Notes: | |||
* The Freezer (Ice Cream) - "Blue Bunny Ice Cream" freezer is a model RIO S125, built in 2010 - was removed from service in 2023 (or 2024?) after identifying it had failed. | |||
== Basketball and Tennis Courts == | == Basketball and Tennis Courts == | ||
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}} | |||
{| class="wikitable" | {| class="wikitable" | ||
!rowspan="2"|Item | !rowspan="2"|Item | ||
| Line 397: | Line 401: | ||
== Clubhouse == | == Clubhouse == | ||
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}} | |||
{| class="wikitable" | {| class="wikitable" | ||
| Line 619: | Line 625: | ||
|30 | |30 | ||
|style="background:#FFC7CE|None | |style="background:#FFC7CE|None | ||
|$ | |$8,200 | ||
| | | | ||
|$8,000 | |$8,000 | ||
| | | | ||
|The steel doors appear to be original to the building. There are nine doors in total: two for the lobby exterior, two for the family restroom, three for the men's room and two for the women's room. It has been proposed to replace the two exterior restroom doors | |The steel doors appear to be original to the building. There are nine doors in total: two for the lobby exterior, two for the family restroom, three for the men's room, and two for the women's room. It has been proposed to replace the two exterior restroom doors and the interior men's room door as soon as possible. Then, replace the two doors between the men's and women's room and lobby in five years or less. The other exterior and interior doors may need to be replaced in 10-15 years. Costs are based on estimates received in 2023. | ||
|- | |- | ||
|Showers | |Showers | ||
| Line 698: | Line 704: | ||
== Grounds == | == Grounds == | ||
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}} | |||
{| class="wikitable" | {| class="wikitable" | ||
| Line 708: | Line 716: | ||
!Last<br>Rehab<br>Year | !Last<br>Rehab<br>Year | ||
!Typical<br>Useful | !Typical<br>Useful | ||
!Estimated<br>Remaining<br>( | !Estimated<br>Remaining<br>(2023) | ||
!1-5<br>Years | !1-5<br>Years | ||
!5-10<br>Years | !5-10<br>Years | ||
| Line 741: | Line 749: | ||
|2020 | |2020 | ||
|5 | |5 | ||
|style="background:#FFEB9C| | |style="background:#FFEB9C|2 | ||
|$14,400 | |$14,400 | ||
|$16,300 | |$16,300 | ||
|$18,500 | |$18,500 | ||
|$20,800 | |$20,800 | ||
|The asphalt parking lot was first installed in 2000. Maintenance is necessary every 5-7 years (largely subject to weather). Maintenance was known to have been performed in [[Club History#2015|2015]] and 2020. Costs for 2025, 2030, 2035, and 2040 are based on the prior estimate (for 2020) with inflation. | |The asphalt parking lot was first installed in 2000. Maintenance is necessary every 5-7 years (largely subject to weather). Maintenance was known to have been performed in [[Club History#2015|2015]] and 2020. Costs for 2025, 2030, 2035, and 2040 are based on the prior estimate (for 2020) with inflation. NOTE: There has been some discussion (Spring 2023) whether a complete re-surfacing may be required? Cost might be as high as $100k? To be discussed further. | ||
|- | |- | ||
|Picnic Tables (Plastic) | |Picnic Tables (Plastic) | ||
| Line 752: | Line 760: | ||
|None | |None | ||
|20 | |20 | ||
|style="background:#FFEB9C| | |style="background:#FFEB9C|4 | ||
|TBD | |TBD | ||
|TBD | |TBD | ||
|TBD | |TBD | ||
|TBD | |TBD | ||
|A spot check of a few tables suggests that the entire lot may have been purchased (or at least manufactured) in 2007. Some tables are starting to fail mechanically and have been temporarily repaired. Some of the painted metal parts are flaking/rusting. It likely makes the most sense to start purchasing a small number of tables to begin replacement of the worst units over time - unless there is a substantial benefit from a bulk order. The lifespan of 20 years is based | |A spot check of a few tables suggests that the entire lot may have been purchased (or at least manufactured) in 2007. Some tables are starting to fail mechanically and have been temporarily repaired. Some of the painted metal parts are flaking/rusting. It likely makes the most sense to start purchasing a small number of tables to begin the replacement of the worst units over time - unless there is a substantial benefit from a bulk order. The lifespan of 20 years is based on current wear and tear. It seems possible that within 5 years (from 2022), the condition of some tables may be approaching "poor". To be determined. | ||
|- | |- | ||
|Picnic Tables (Wooden) | |Picnic Tables (Wooden) | ||
| Line 768: | Line 776: | ||
|$130 | |$130 | ||
|$150 | |$150 | ||
|Outright replacement of the wooden picnic tables (7 on the property as of 2021) is not anticipated. Instead, periodic wood/hardware replacement | |Outright replacement of the wooden picnic tables (7 on the property as of 2021) is not anticipated. Instead, periodic wood/hardware replacement and stripping/painting should keep the tables in good working order. Predicting maintenance costs is difficult, given the volatile cost of lumber. Assume $100 every 5 years, adjusted for inflation. All tables were power-washed and painted in 2021. | ||
|- | |- | ||
|Play Structure | |Play Structure | ||
| Line 774: | Line 782: | ||
|None | |None | ||
|20 | |20 | ||
|style="background:#C6EFCE| | |style="background:#C6EFCE|13 | ||
| | | | ||
|TBD | |TBD | ||
| | | | ||
|TBD | |TBD | ||
|The present Miracle Recreation play structure (and swing sets) were installed in 2016. Miracle recommends playground updates every 8-10 years; playgrounds can last 10-20 or more years dependent upon weather and usage. An estimated replacement date of 20 years is given, though the equipment may last longer. Regular inspections must be performed. Assume some maintenance cost within 5-10 years (from 2021). | |The present Miracle Recreation play structure (and swing sets) were installed in 2016. Miracle recommends playground updates every 8-10 years; playgrounds can last 10-20 or more years, dependent upon weather and usage. An estimated replacement date of 20 years is given, though the equipment may last longer. Regular inspections must be performed. Assume some maintenance cost within 5-10 years (from 2021). | ||
|- | |- | ||
|Privacy Fence | |Privacy Fence | ||
| Line 810: | Line 818: | ||
|None | |None | ||
|40 | |40 | ||
|style="background:#C6EFCE| | |style="background:#C6EFCE|37 | ||
| | | | ||
| | | | ||
| Line 821: | Line 829: | ||
|None | |None | ||
|5 | |5 | ||
|style="background:#FFEB9C| | |style="background:#FFEB9C|2 | ||
|$380 | |$380 | ||
|$420 | |$420 | ||
|$480 | |$480 | ||
|$540 | |$540 | ||
|The present APs were installed in 2020 and are fully supported as of 2021. An estimated life of 5 years is given, largely due to the likelihood that the product will go EOL by then. 2 of the 3 APs are mounted outdoors, and the 3rd exists in a non-climate controlled building (clubhouse). The APs are powered year-round to help drive off potential internal condensation. Still, exposure may reduce their lifespan. If the product is still supported after the 5-year mark (2025), and the units are functional, an evaluation of the performance vs. a replacement should be considered. The replacement cost in 2021 is $125/ea (3 units). A replacement cycle of 5 years is assumed (units may remain in service longer). | |The present APs were installed in 2020 and are fully supported as of 2021. An estimated life of 5 years is given, largely due to the likelihood that the product will go EOL by then. 2 of the 3 APs are mounted outdoors, and the 3rd exists in a non-climate-controlled building (clubhouse). The APs are powered year-round to help drive off potential internal condensation. Still, exposure may reduce their lifespan. If the product is still supported after the 5-year mark (2025), and the units are functional, an evaluation of the performance vs. a replacement should be considered. The replacement cost in 2021 is $125/ea (3 units). A replacement cycle of 5 years is assumed (units may remain in service longer). | ||
|- | |- | ||
|Volleyball Net | |Volleyball Net | ||
| Line 832: | Line 840: | ||
|None | |None | ||
|5 | |5 | ||
|style="background:#FFEB9C| | |style="background:#FFEB9C|3 | ||
| | | | ||
|$220 | |$220 | ||
| Line 842: | Line 850: | ||
== Large Pavilion == | == Large Pavilion == | ||
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}} | |||
{| class="wikitable" | {| class="wikitable" | ||
| Line 894: | Line 904: | ||
== Men's Restroom == | == Men's Restroom == | ||
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}} | |||
{| class="wikitable" | {| class="wikitable" | ||
| Line 916: | Line 928: | ||
|} | |} | ||
== | == Pool == | ||
{| | {{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}} | ||
{| class="wikitable" | {| class="wikitable" | ||
| Line 1,188: | Line 1,161: | ||
== Pump House == | == Pump House == | ||
{{Note|type=warn|text=This section was last updated in 2023 and needs to be reviewed.}} | |||
{| class="wikitable" | {| class="wikitable" | ||
| Line 1,440: | Line 1,415: | ||
== Snack Shack == | == Snack Shack == | ||
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}} | |||
{| class="wikitable" | {| class="wikitable" | ||
| Line 1,568: | Line 1,545: | ||
== Women's Restroom == | == Women's Restroom == | ||
{{Note|type=warn|text=This section was last updated in 2021 and needs to be reviewed.}} | |||