Asset Registry: Difference between revisions
no edit summary
Matt Parnell (talk | contribs) No edit summary |
Matt Parnell (talk | contribs) No edit summary |
||
| Line 375: | Line 375: | ||
|The asphalt parking lot was first installed in 2000. Maintenance is necessary every 5-7 years (largely subject to weather). Maintenace was known to have been performed in [[Club History#2015|2015]] and 2020. Cost for 2025, 2030, 2035, and 2040 is based on the prior estimate (for 2020) with inflation. | |The asphalt parking lot was first installed in 2000. Maintenance is necessary every 5-7 years (largely subject to weather). Maintenace was known to have been performed in [[Club History#2015|2015]] and 2020. Cost for 2025, 2030, 2035, and 2040 is based on the prior estimate (for 2020) with inflation. | ||
|- | |- | ||
|Picnic Tables | |Picnic Tables (Plastic) | ||
|- | |- | ||
|Picnic Tables | |Picnic Tables (Wooden) | ||
| | |Unknown | ||
|2021 | |||
|Unknown | |||
|Unknown | |||
|$100 | |||
|$110 | |||
|$130 | |||
|$150 | |||
|Outright replacement of the wooden picnic tables (7 on the property as of 2021) is not anticipated. Instead, periodic wood/hardware replacement, along with stripping/painting should keep the tables in good working order. Predicting the cost of maintenance is difficult, given the volatile cost of lumber. Assume $100 every 5 years, adjusted for inflation. | |||
|- | |- | ||
|Play Structure | |Play Structure | ||