Asset Registry: Difference between revisions

no edit summary
No edit summary
No edit summary
Line 375: Line 375:
|The asphalt parking lot was first installed in 2000.  Maintenance is necessary every 5-7 years (largely subject to weather).  Maintenace was known to have been performed in [[Club History#2015|2015]] and 2020.  Cost for 2025, 2030, 2035, and 2040 is based on the prior estimate (for 2020) with inflation.
|The asphalt parking lot was first installed in 2000.  Maintenance is necessary every 5-7 years (largely subject to weather).  Maintenace was known to have been performed in [[Club History#2015|2015]] and 2020.  Cost for 2025, 2030, 2035, and 2040 is based on the prior estimate (for 2020) with inflation.
|-
|-
|Picnic Tables - Plastic
|Picnic Tables (Plastic)
|-
|-
|Picnic Tables - Wooden
|Picnic Tables (Wooden)
|
|Unknown
|2021
|Unknown
|Unknown
|$100
|$110
|$130
|$150
|Outright replacement of the wooden picnic tables (7 on the property as of 2021) is not anticipated.  Instead, periodic wood/hardware replacement, along with stripping/painting should keep the tables in good working order.  Predicting the cost of maintenance is difficult, given the volatile cost of lumber.  Assume $100 every 5 years, adjusted for inflation.
|-
|-
|Play Structure
|Play Structure