Board Building and Grounds: Difference between revisions
→Early September: Water and Pool Closing
Matt Parnell (talk | contribs) |
Matt Parnell (talk | contribs) |
||
| Line 104: | Line 104: | ||
== Post-Season Tasks == | == Post-Season Tasks == | ||
=== Early September: | === Early September: Closing Activities === | ||
* Remove the ceiling fans from the large pavilion. As of 2020, duplicate mounts have been installed in the basement ceiling joists for safe storage. Removing the fans is very important; high winds during winter can cause the fans to rotate at high speeds, damaging fan blades and/or the vinyl ceiling of the pavilion. | * Remove the ceiling fans from the large pavilion. As of 2020, duplicate mounts have been installed in the basement ceiling joists for safe storage. Removing the fans is very important; high winds during winter can cause the fans to rotate at high speeds, damaging fan blades and/or the vinyl ceiling of the pavilion. | ||
* Be on-site for pool closing and winterization with the contractor. | * Be on-site for pool closing and winterization with the contractor. | ||
** Ensure that all parts removed (particularly in the pump house) are properly stored/labeled. In the past, some parts have been lost, adding cost and delays to opening. | ** Ensure that all parts removed (particularly in the pump house) are properly stored/labeled. In the past, some parts have been lost, adding cost and delays to opening. | ||
** Identify any issues found and make plans to resolve by the next season's opening. | ** Identify any issues found and make plans to resolve them by the next season's opening. | ||
* Remove and store the pH and ORP probes off-site per the manufacturer's recommendations (must be kept in solution and above freezing temperatures). | * Remove and store the pH and ORP probes off-site per the manufacturer's recommendations (must be kept in solution and above freezing temperatures). | ||
* Turn the [[Water Gate Valve|water gate valve]] at the street and request water meter removal by the city. | * Turn the [[Water Gate Valve|water gate valve]] at the street and request water meter removal by the city. | ||
* Turn off all labeled seasonal circuits in the pump house breaker panel. Ensure that the sump pump and dusk-to-dawn lighting circuits remain on year-round. | * Turn off all labeled seasonal circuits in the pump house breaker panel. Ensure that the sump pump and dusk-to-dawn lighting circuits remain on year-round. | ||
* Coordinate bringing in a swim team (via the [[Board President|president]]) to help with fall cleanup and be on-site the day of. The team typically will: | |||
** Move and stack all tables, chairs, games, benches, and garbage receptacles under the large pavilion. | |||
** Remove nets and umbrellas (with B&G support). | |||
** Perform any other requested clean-up activities on an as-needed basis. | |||
* Cancel garbage pickup. | * Cancel garbage pickup. | ||